My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Design Services for the East Race Sewer Analysis - Christopher B. Burke Engineering, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - Design Services for the East Race Sewer Analysis - Christopher B. Burke Engineering, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:19 PM
Creation date
11/14/2019 10:12:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated April 10, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: November 12, 2019 <br />b. Owner: Board of Public Works, City of South Bend, Indiana ("Owner") <br />C. Engineer: Chistopher B. Burke Engineering, LLC (CBBEL) ("Engineer") <br />d. Project: East Race Sewer Analysis m(1m18-034) ("Project") <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Task 1— Revise Report: CBBEL will revise the current draft of the report based on <br />the following new information: <br />a) Updated SDC tables and numbers provided by the City <br />b) New routing of sanitary sewage from Cascades Phase 2 & 3 which will result in <br />a new Colfax Lift Station upgrade schedule. <br />c) Pump data provided by the City that will replace the previously Population <br />Equivalence (PE) calculations. <br />CBBEL will utilize the updated calculations and the City's lift station standards to <br />provide a revised report that will include updated recommendations. <br />2) Task 2 — Bid Documents and Permits: CBBEL will prepare plans and <br />specifications for bidding purposes. CBBEL will use existing aerial images as the <br />base for the plans. The project specifications will utilize INDOT standard pay items <br />and special provisions when applicable. No topographic survey will be obtained as <br />part of this project. CBBEL will prepare and submit permit applications to IDEM <br />for the new lift station. <br />3) Task 3 — Design Coordination with the City: CBBEL will meet the City to <br />discuss review comments on the plan submittals. The City anticipates three <br />submittals and will include 30%, 60%, and 90% plan sets. A field check is also <br />anticipated. At total of four (4) meetings have been included in this task. <br />4) Task 4 — Bidding Services: CBBEL will provide "As -Needed" Bidding and <br />Services that include: <br />a) Attend a Pre -Bid Meeting <br />b) Respond to contractor questions and issue addenda (if needed). <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.