BID/PROPOSAL ar�arwr
<br />CITY OF SOUTH BEND
<br />Project Name: Historic Leeper Park Improvements -Bid Package 2
<br />Project Number: 118-010B
<br />_.-...__......' .....................
<br />�.�. �.
<br />For Bids Due: October 22, 2019
<br />Contractor Name: Rieth-Riley Construction Co., Inc.
<br />30
<br />SIDEWALK, CONCRETE, 4 IN
<br />281.00
<br />SYS
<br />$ 70.00
<br />S 19,670.0
<br />31
<br />CURB RAMP, CONCRETE
<br />104.00
<br />SYS
<br />$ 180.00
<br />$ 18,720.0
<br />32
<br />DETECTABLE WARNING
<br />132.00
<br />LFT
<br />$ 25.00
<br />$ 3,300.0
<br />33
<br />PCCP, 8 IN. (TABLE TOP RIVERSIDE)
<br />340.00
<br />SYS
<br />$ 70.00
<br />$ 23,800.0
<br />34
<br />CENTER CURB, D, CONCRETE
<br />34.00
<br />LFT
<br />$ 100.00
<br />$ 3,400.00
<br />35
<br />CURB, CONCRETE
<br />289.00
<br />LFT
<br />$ 40.0
<br />$ 11,560.0
<br />36
<br />CURB AND GUTTER, CONCRETE
<br />346.00
<br />LFT
<br />$ 50.00
<br />$ 17,300.0
<br />37
<br />CAST LIMESTONE RAILING
<br />120.00
<br />LFT
<br />$ *1,200.00
<br />$ 144,000.0
<br />38
<br />MULCHED SEEDING U
<br />100.00
<br />SYS
<br />$ 48.5
<br />$ 4,850.0
<br />39
<br />NURSERY SODDING
<br />204.00
<br />SYS
<br />$ 37.5
<br />$ 7,650.0
<br />40
<br />GEOTEXTILES
<br />117.00
<br />SYS
<br />$ 16.25
<br />$ 1,901.25
<br />41
<br />CLASS I RIPRAP
<br />117.00
<br />TON
<br />$ 112.00
<br />$ 13,104.0
<br />42
<br />12 IN STORM PIPE WITH GRANULAR BACKFILL
<br />122.00
<br />LFT
<br />$ 79.00
<br />$ 9,638.0
<br />24 IN STORM PIPE WITH GRANULAR BACKFILL
<br />43
<br />64.00
<br />LFT
<br />(CONCRETE)
<br />$ 116.00
<br />$ 7424.00
<br />44
<br />24 IN END SECTION
<br />1.00
<br />EACH
<br />$ 1,800.00
<br />$ 1,800.0
<br />45
<br />CASTING, ADJUST TO GRADE
<br />3.00
<br />EACH
<br />$ 409.00
<br />$ 1,227.0
<br />46
<br />INLET, M10
<br />5.00
<br />EACH
<br />$ 2,180.00
<br />$ 10,900.00
<br />47
<br />MANHOLE, 48 IN DIAMETER
<br />1.00
<br />EACH
<br />$ 3400.00
<br />$ 3400.0
<br />48
<br />RIVER OVERLOOK
<br />1.00
<br />LS
<br />$ 577,000.0
<br />$ 577,000.0
<br />PILE, CONCRETE, STEEL SHELL ENCASED, 0.312
<br />49
<br />332.00
<br />LFT
<br />N, 14 IN
<br />$ 85.o
<br />$ 28,220.00
<br />50
<br />36" DIAMETER DRILLED SHAFT
<br />205.00
<br />LFT
<br />$ 1,000.0
<br />$ 205 000.0
<br />51
<br />RIVER OVERLOOK ELECTRICAL
<br />1.00
<br />LS
<br />$ 12,380.0
<br />$ 12,380.0
<br />52
<br />6' BENCH, BACKED
<br />4.00
<br />EACH
<br />$ 7,487.21
<br />$ 29,948.84
<br />53
<br />ORNAMENTAL FENCE
<br />83.00
<br />LFT
<br />$ 100.00,
<br />$ 8300.00
<br />54
<br />SHADE TREE, 3 IN CAL.
<br />3.00
<br />EACH
<br />$ 725.00'
<br />$ 2,175.0
<br />55
<br />SHRUB, 3 GAL.
<br />21.00
<br />EACH
<br />$ 27.32
<br />S 573.72
<br />56
<br />PERENNIAL, 1 GAL.
<br />364.00
<br />EACH
<br />$ 13.75'
<br />$ 5,005.00
<br />57
<br />SOILAMENDMENT
<br />14.25
<br />CYS
<br />$ 90.00
<br />$ 1,282.5
<br />58
<br />SHREDDED HARDWORK BARK MULCH
<br />15.00
<br />CYS
<br />$ 65.00
<br />975.0
<br />59
<br />STEEL EDGING
<br />91.00
<br />LFT
<br />$ 7.75
<br />$ 705.25
<br />Version 1/17/2019 Contractor's Bid for Public Works -46
<br />
|