Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Historic Leeper Park Improvements -Bid Package 2 <br />Project Number <br />For Bids Due <br />118-010B <br />October 22, 2019 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />BASE BID <br />ITEM <br />QUANTITY <br />UNIT <br />UNIT <br />ITEM <br />COST <br />TOTAL <br />1 <br />CONSTRUCTION ENGINEERING <br />1.00 <br />LS <br />i0e000100 <br />$ 10,000.0 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1.00 <br />LS <br />$ 261816.74 <br />$ 261816.74 <br />3 <br />MAINTAINING TRAFFIC <br />1.00 <br />LS <br />$ 7s02.0 <br />$ 7s02.0 <br />4 <br />SHRUB, REMOVE <br />11.00 <br />EACH <br />$ 100.00 <br />$ 1,100.0 <br />5 <br />TREE, 8 IN., REMOVE <br />1.00 <br />EACH <br />$ 750.0 <br />$ 750.00 <br />6 <br />TREE, 10 IN., REMOVE <br />1.00 <br />EACH <br />$ 1200.0 <br />$ 1,200.00 <br />7 <br />TREE, 16 IN., REMOVE <br />3.00 <br />EACH <br />$ 1,600.00 <br />$ 4,800.0 <br />8 <br />TREE, 28 IN., REMOVE <br />1.00 <br />EACH <br />$ 3,000.00 <br />$ 3,000.00 <br />9 <br />TREE PROTECTION <br />1.00 <br />LS <br />$ 2,600.00 <br />$ 2,600.0 <br />10 <br />CONCRETE STEPS, REMOVE <br />1.00 <br />LS <br />$ 300.0 <br />$ 300.0 <br />11 <br />GUARDRAIL, REMOVE <br />52.00 <br />LFT <br />23.00 <br />$ 1,196.00 <br />12 <br />12 IN. STORM SEWER, REMOVE <br />104.00 <br />LFT <br />$ 22.00 <br />$ 2,288.00 <br />13 <br />24 IN. STORM SEWER, REMOVE <br />64.00 <br />LFT <br />$ 25.00 <br />$ 1,600.0 <br />14 <br />CATCH BASIN, REMOVE <br />4.00 <br />EACH <br />$ 425.0 <br />$ 1,700.00 <br />15 <br />CURB AND GUTTER, REMOVE <br />312.00 <br />LFT <br />$ 26.00 <br />$ 8,112.0 <br />16 <br />CURB, CONCRETE, REMOVE <br />274.00 <br />LFT <br />$ 25.00 <br />$ 6850.0 <br />17 <br />SIDEWALK, CONCRETE REMOVE <br />230.00 <br />SYS <br />$ 30.50 <br />$ 7,015.00 <br />18 <br />CONCRETE APPROACH, REMOVE <br />55.00 <br />SYS <br />24.00 <br />$ 1,320.00 <br />19 <br />FENCE, CHAIN LINK, REMOVE <br />83.00 <br />LFT <br />$ 14.50 <br />$ 1,203.5 <br />20 <br />SALVAGE STEPS <br />1.00 <br />EACH <br />$ 1,200.00 <br />$ 1,200.0 <br />21 <br />SALVAGE BENCH <br />1.00 <br />EACH <br />$ 200.0 <br />$ 200.0 <br />22 <br />DEWATERING <br />1.00 <br />LS <br />$ 20,000.00 <br />$ 20,000.00 <br />23 <br />EXCAVATION, COMMON <br />150.00 <br />CYS <br />$ 84.00 <br />$ 12,600.00 <br />24 <br />BORROW <br />50.00 <br />CYS <br />$ 190.00 <br />$ _9,500.00 <br />25 <br />SUBGRADE TREATMENT, TYPE II <br />363.00 <br />SYS <br />$ 23.00 <br />$ 8,349.0 <br />26 <br />COMPACTED AGGREGATE #53, BASE <br />88.00 <br />CYS <br />$ 80.20 <br />$ 7,057.60 <br />27 <br />MILLING, ASPHALT, 1.5 IN. <br />32.00 <br />SYS <br />8 100.00 <br />$ 3,200.0 <br />28 <br />HMA FOR PATCHING <br />17.00 <br />TON <br />is 400.00 <br />$ 6,800.0 <br />29 <br />ASPHALTSURFACE <br />3.00 <br />TON <br />1,800.00, <br />Version 1/17/2019 Contractor's Bid for Public Works -45 <br />