BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Historic Leeper Park Improvements -Bid Package 2
<br />Project Number
<br />For Bids Due
<br />118-010B
<br />October 22, 2019
<br />Contractor Name: Rieth-Riley Construction Co., Inc.
<br />BASE BID
<br />ITEM
<br />QUANTITY
<br />UNIT
<br />UNIT
<br />ITEM
<br />COST
<br />TOTAL
<br />1
<br />CONSTRUCTION ENGINEERING
<br />1.00
<br />LS
<br />i0e000100
<br />$ 10,000.0
<br />2
<br />MOBILIZATION AND DEMOBILIZATION
<br />1.00
<br />LS
<br />$ 261816.74
<br />$ 261816.74
<br />3
<br />MAINTAINING TRAFFIC
<br />1.00
<br />LS
<br />$ 7s02.0
<br />$ 7s02.0
<br />4
<br />SHRUB, REMOVE
<br />11.00
<br />EACH
<br />$ 100.00
<br />$ 1,100.0
<br />5
<br />TREE, 8 IN., REMOVE
<br />1.00
<br />EACH
<br />$ 750.0
<br />$ 750.00
<br />6
<br />TREE, 10 IN., REMOVE
<br />1.00
<br />EACH
<br />$ 1200.0
<br />$ 1,200.00
<br />7
<br />TREE, 16 IN., REMOVE
<br />3.00
<br />EACH
<br />$ 1,600.00
<br />$ 4,800.0
<br />8
<br />TREE, 28 IN., REMOVE
<br />1.00
<br />EACH
<br />$ 3,000.00
<br />$ 3,000.00
<br />9
<br />TREE PROTECTION
<br />1.00
<br />LS
<br />$ 2,600.00
<br />$ 2,600.0
<br />10
<br />CONCRETE STEPS, REMOVE
<br />1.00
<br />LS
<br />$ 300.0
<br />$ 300.0
<br />11
<br />GUARDRAIL, REMOVE
<br />52.00
<br />LFT
<br />23.00
<br />$ 1,196.00
<br />12
<br />12 IN. STORM SEWER, REMOVE
<br />104.00
<br />LFT
<br />$ 22.00
<br />$ 2,288.00
<br />13
<br />24 IN. STORM SEWER, REMOVE
<br />64.00
<br />LFT
<br />$ 25.00
<br />$ 1,600.0
<br />14
<br />CATCH BASIN, REMOVE
<br />4.00
<br />EACH
<br />$ 425.0
<br />$ 1,700.00
<br />15
<br />CURB AND GUTTER, REMOVE
<br />312.00
<br />LFT
<br />$ 26.00
<br />$ 8,112.0
<br />16
<br />CURB, CONCRETE, REMOVE
<br />274.00
<br />LFT
<br />$ 25.00
<br />$ 6850.0
<br />17
<br />SIDEWALK, CONCRETE REMOVE
<br />230.00
<br />SYS
<br />$ 30.50
<br />$ 7,015.00
<br />18
<br />CONCRETE APPROACH, REMOVE
<br />55.00
<br />SYS
<br />24.00
<br />$ 1,320.00
<br />19
<br />FENCE, CHAIN LINK, REMOVE
<br />83.00
<br />LFT
<br />$ 14.50
<br />$ 1,203.5
<br />20
<br />SALVAGE STEPS
<br />1.00
<br />EACH
<br />$ 1,200.00
<br />$ 1,200.0
<br />21
<br />SALVAGE BENCH
<br />1.00
<br />EACH
<br />$ 200.0
<br />$ 200.0
<br />22
<br />DEWATERING
<br />1.00
<br />LS
<br />$ 20,000.00
<br />$ 20,000.00
<br />23
<br />EXCAVATION, COMMON
<br />150.00
<br />CYS
<br />$ 84.00
<br />$ 12,600.00
<br />24
<br />BORROW
<br />50.00
<br />CYS
<br />$ 190.00
<br />$ _9,500.00
<br />25
<br />SUBGRADE TREATMENT, TYPE II
<br />363.00
<br />SYS
<br />$ 23.00
<br />$ 8,349.0
<br />26
<br />COMPACTED AGGREGATE #53, BASE
<br />88.00
<br />CYS
<br />$ 80.20
<br />$ 7,057.60
<br />27
<br />MILLING, ASPHALT, 1.5 IN.
<br />32.00
<br />SYS
<br />8 100.00
<br />$ 3,200.0
<br />28
<br />HMA FOR PATCHING
<br />17.00
<br />TON
<br />is 400.00
<br />$ 6,800.0
<br />29
<br />ASPHALTSURFACE
<br />3.00
<br />TON
<br />1,800.00,
<br />Version 1/17/2019 Contractor's Bid for Public Works -45
<br />
|