My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/14/1913 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1913
>
03/14/1913 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:20:06 PM
Creation date
10/17/2019 1:29:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/14/1913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board met in regular session at 10:00 A.M. All members present. <br />Remonstrance placed Nefore the Board by Mr. CHas. W. Arnold against Trunk Sewer on <br />Michigan Street, Under Improvement Resolution No. 216. The same was referred to the <br />Mr. Romig, City Attorney. <br />Bids were received and opened on the following improvements. <br />r Pipe sewer on Frances Street, Under Improvement Resolution No. <br />210. <br />✓ Pipe sever on St. Peter Street, Under Improvement Resolution <br />No. <br />211. <br />\ ✓Pipe sewer on Euclid Avenue " "" "" <br />No. <br />212. <br />Pipe sewer can. Van Buren Street, <br />No. <br />213. <br />,/Pipe sewer on Marietta Street, <br />No. <br />214 <br />Pipe sewer on Studebaker Street " "n "" <br />No. <br />215 <br />All of the bids on the foregoigg imrovements were referred to <br />the City Civil Engineer <br />for tabulation to be reported back Tuesday Larch 19th.. 1913. <br />�n� i provet tsngineer filed with the Board the following estimates <br />on the follow <br />Quincy Street pipe sewer improvement from Portage Ave. to Blaine Ave. for the amount <br />of .................................... ..... ......... too ... ...................1,700.00 <br />f Pavement on Kemble Ave. from Prairie Ave to Ewing Ave. at.....................27:520.0 <br />Pavement on Ottowa Court from Vistula Ave. to the L. S. &M. So. R. R. at.......... 900.00 <br />Concrete pavement on South Bend Ave. from Ed-2 <br />y St. to City Limits,.at.... ...$12,700.0 <br />,/ Pavement on Pine Street from Napier Street to L. S. &M. S. R. R. at .............. $42000.00 <br />Concrete <br />pavement on Howard <br />Street from Leeper Ave. <br />to Niles Avenue at....... <br />39900.00 <br />i/pavement <br />on College Street <br />From Washington Avenue to <br />Michigan Avenue .......$282240.00 <br />Grade, curb and walk on Johnson Street from Vassar Ave. to N. end. of Yayr' s <br />Michigan Avene Addition at ....................,...... E............ ....... 2,000.00 <br />✓ Pavement on Prairie Avenue from _Webster. Street to Grant Street, at.......:..23,000.00 <br />J/ Grade, curb and walk on Olive Street from Elwood Avenue to Keller Street at.$ 5,090.00 <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.