Laserfiche WebLink
26. Excavation of drilled pier foundation(s) including spoils removal. Placement and finishing <br />of concrete for foundations. Note: For this quotation Daktronics basis for foundation <br />design is a class 4 soil with a minimum allowable lateral bearing pressure of 150 psf/ft per <br />Chapter 18 of the International Building Code (IBC), The foundation excavation is based <br />on the excavated area remaining open without collapsing to allow the placement of <br />✓' applicable reinforcement and/or structural columns and concrete. This quotation does <br />not include casings, slurry, dewatering or any other soil stabilization. In the event rock, <br />water, differing soil conditions other than class 4 soil per Chapter 18 of the International <br />Building Code (IBC) or unforeseen conditions are encountered, the Customer will be <br />responsible for any additional costs, plus overhead and profit of 20%. <br />✓ 27.Steel fabrication and erection of structural columns. <br />✓ 28.Steel fabrication and erection of sub -structure for Equipment mounting. <br />✓ 29. Paint new support structure. <br />✓ 30.1-ift and mount Equipment listed in this quotation. <br />31. Provide primary power feed up to and including five (5) feet off grade on structure in the <br />✓ form of transformer and electrical disconnect with over current protection per all <br />applicable electrical codes and regulations. <br />Note: Maximum voltage of 120 volts line to neutral for all display systems. <br />32. Provide secondary power conduits, distribution panel, power cable and power hook-up <br />✓ from the five (5) feet off grade on structure to all Daktronics supplied load <br />centers/termination panel at/within the Equipment. <br />✓ 33.Installation of Daktronics provided radio/wireless receiver hardware at the equipment <br />location. <br />34. Provide all required building (wall/roof) penetrations for the installation of Daktronics <br />provided wireless bridge and/or radio transmitter components at the control location. <br />Mount Daktronics provided wireless bridge and/or radio transmitter components to the <br />✓ building in accordance with manufacturers recommendations. Building penetration <br />location shall provide clear line -of -sight to the equipment. Provide all conduit, with pull <br />string, from control location equipment to the building penetration location. <br />35. Provide a climate controlled and secure control room for all control systems. Normal <br />operating temperature should be between 400 to 90° Fahrenheit (40 to 32' Celsius). <br />Normal operating humidity should be less than 80% non -condensing, Storage <br />temperature should be between -10' to 105° Fahrenheit (-23° to 41 ° Celsius). Storage <br />humidity should be less than 95% non -condensing, Keep computers and monitors out of <br />direct sunlight during storage. Allow control equipment taken out of storage to return to <br />operating temperature range prior to turning it on (24 hours recommended). <br />✓ 36. Required power outlets on clean dedicated circuit(s) for all scoring and control <br />equipment. <br />✓ 37. Unpack, set-up, hook-up, and testing of control system. <br />✓ ✓ 38. Provide personnel for maintenance and operator training. <br />✓ 39.Perform maintenance training during installation. <br />✓ 40. Perform operator training. <br />✓ 41. Perform final systems testing and commissioning. <br />✓ 42. Final acceptance, per DF-1252. <br />201 Daktronics Drive Quote # 701584-1-1 <br />Brookings, SD 57006 USA <br />www.daktronics.com Page 2 of 3 <br />DAKTROrillCS <br />