My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
QPA Purchase - Daktronics - New Scoreboard Orange Field
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
QPA Purchase - Daktronics - New Scoreboard Orange Field
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:54:46 AM
Creation date
10/9/2019 11:50:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br />Outdoor <br />Responsible Party <br />Daktronics Customer <br />Description <br />✓ 1.Provide payment and performance Bond. <br />✓ 2.Secure necessary sign permits. <br />✓ 3.Secure necessary construction permits. <br />✓ 4. Provide existing utility drawings. <br />✓ <br />5.Removal of existing equipment. <br />✓ <br />6.Removal of existing structure (excluding footings). <br />✓ <br />7. Disposal of existing equipment. <br />✓ <br />8. Disposal of existing structure (excluding footings). <br />✓ <br />9.Generate and issue standard product attachment drawings. <br />✓ <br />10.Generate and issue standard product electrical and signal drawings. <br />✓ 11. Provide approval of all engineering drawings, electrical drawings, shop drawings, <br />equipment locations, color renderings, and ad copy layouts. <br />✓ 12. Provide soil investigation report at time of order, <br />13, Unobstructed access to equipment and control room installation site until display is 100%. <br />Installation equipment (cranes, lifts, trucks, concrete trucks, etc.) are expected to have <br />✓ access directly to the scoreboard/structure location. No concrete pumping, concrete <br />buggies, or crane picks over 10' distance from scoreboard structure are included. <br />✓ 14. Mark location of the new Equipment as delineated in the quote. <br />15. Locate public underground utilities. <br />✓ 16. Locate private underground utilities. <br />✓ 17. Landscaping to include all. <br />✓ 18. Provide camera-ready artwork for ad panels, and logos at time of order. <br />✓ 19. Provide all landscape protection, track, sidewalk, path, site restoration, and/or sprinkler <br />system repair work. <br />✓ <br />20.Site clean-up after Daktronics work. <br />✓ <br />21. Crating and shipping of all equipment to facility via common or independent carrier. <br />✓ <br />22.Accept, lift, unload, and inspect all scoring equipment and control equipment from <br />carrier. <br />✓ 23. Provide storage of scoring equipment and control equipment in a safe, dry, and secure <br />location until installation. <br />✓ <br />24.Provide Equipment attachment hardware. <br />✓ <br />25.Install Equipment attachment hardware. <br />201 Daktronics Drive <br />Brookings, SD 57006 USA <br />www.daktronics.com <br />Quote # 701584-1-1 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.