My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Consulting Contract - Lochmueller Group - Inspection for Corby-Ironwood-Rockne Intersection Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Consulting Contract - Lochmueller Group - Inspection for Corby-Ironwood-Rockne Intersection Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:31:07 PM
Creation date
10/9/2019 10:56:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A .,1n <br />227 W. JEFFERSON BOULEVARD PHONE: 574/235-9251 <br />SUITE 1316 F'Ax: 574/235-9171 <br />Sou rH BEND, IN 46601-1830 ;M <br />CITY OF SOUTH BEND PETE BUTTIOIm, MAYOR <br />DEPARTMENT OF .P"UBLIC ''WORKS <br />ERIC HORVATH, DIRECTOR <br />Ms. Marcia Blansett <br />LPA Program Director <br />315 East Boyd Boulevard <br />P.O. Box 429 <br />LaPorte, Indiana 46352 <br />September 4, 2019 <br />Re: Des, No.: 1600074 <br />Project Location: Corby Blvd/Ironwood Dr/Rockne Dr within City of South Bend, Indiana <br />Dear Ms. Blansett, <br />Mr. Dale Wills, who is an employee of Lochmuller Group, Inc. is hereby designated full time <br />Resident Project Representative for the construction of the above referenced subject. It is understood that <br />in this capacity, the designated individual will be in full time direct control of the project, and will follow <br />the established procedures of the Indiana Department of Transportation (INDOT) in the discharge of these <br />duties and will be working under the supervision of the INDOT District Area Engineer and will look to <br />that office for advice and instruction. <br />The Project Representative will utilize the services of the following personnel: <br />1. Myron Cohagan, Assistant Project Supervisor <br />2. Scott Bockover, Inspector <br />3. Barbie Swihart Stutzman, PE, Project Engineer <br />4. Susan Al -Abbas, PE, Project Manager <br />who are employed by above named Firm in accomplishing the overall supervision of this project. The <br />testing equipment shall be provided by the named Firm as required. <br />We shall maintain all books, documents, paper, accounting records and other evidence pertaining to the <br />cost incurred and shall make such materials available at their respective offices at all reasonable times <br />during the contract period and for three (3) years from the date of final payment. The Federal Highway <br />Administration, the State of Indiana, or other authorized representatives of any unit providing funding for <br />the project shall be furnished copies thereof if requested. ° <br />Sincerely, <br />LPA 9111111��':e in Respoiisible Charge <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.