My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09242019 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2019
>
09242019 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:19:06 PM
Creation date
10/8/2019 10:46:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING SEPTEMBER 24, 2019 280 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau'and carried, the above bids were <br />referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF BIDS — MAIN AND COLFAX PARKING STRUCTURE PAINTING <br />REMOVAL — PROJECT NO. 119-078 (PARKING GARAGE FUND) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. Ms. Martin, Clerk of the Board, stated no bids were received. <br />OPENING OF BIDS — CENTURY CENTER PARKING LOT GATEWAY IMPROVEMENTS <br />— PROJECT NO. 118-035R (HOTEL MOTEL TAX FUND) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />R. YODER CONSTRUCTION, INC <br />27453 CR 150 PO Box 69 <br />Nappanee, IN 46550 <br />Bid was signed by: Jason Yoder <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />:M <br />Base Bid Total <br />$143,528.95 <br />Alternate A Total <br />$3,600.00 <br />Alternate B Total <br />$2,850.00 <br />Base Bid Plus Alternates <br />$149,978.95 <br />SELGE CONSTRUCTION CO., INC <br />2833 S. 111h Street <br />Niles, MI 49120 <br />Bid was signed by: Robert Kuhns <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />Base Bid Total <br />$187,431.25 <br />Alternate A Total <br />$3,600.00 <br />Alternate B Total <br />$7,000.00 <br />Base Bid Plus Alternates <br />$198,031.25 <br />LARSON DANIELSON CONSTRUCTION CO. INC. <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Bid was signed by: Timothy Larson <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Base Bid Total <br />$148,168.44 <br />Alternate A Total <br />$4,180 <br />Alternate B Total <br />$3,600 <br />Base Bid Plus Alternates <br />$155,948.44 <br />WALSH & KELLY, INC. <br />24358 SR 23 <br />South Bend, IN 46614 <br />
The URL can be used to link to this page
Your browser does not support the video tag.