Laserfiche WebLink
.esPt rr u- „���, a mte t friar 1'rtr xm a8s F�tir kav sir arrrrorouewta ,x nienl 8, ndergra° unrB tuara� + .1 mmmml removal and ,1"ve ma di ��fion <br />Sava eti. Former Steve's Marlith rrc Service Stati mru Fspcifity in South fiend In ig[LiL f'ao ),;a ff'2019 07-159 Page 15 <br />waste disposal and lesser sample vial usage. Furthermore, Pace provides reusable coolers <br />to its clients for sample holding and delivery; <br />• Pace utilizes a gasoline/electric hybrid vehicle for local courier services and encourages <br />carpooling amongst its staff; and <br />« Pace has implemented a solvent recycling program, recycling commonly utilized <br />laboratory solvents such as methylene chloride for industrial repurposing as opposed to <br />disposal, saving in disposal of hazardous wastes. <br />Heartland is committed to conducting site activities in as green a manner as possible to promote <br />energy savings, promote reuse and recycling, minimize carbon footprint emissions and to <br />minimize waste generation and disposal. Heartland field staff will constantly monitor site <br />activities to make sure these strategies are being implemented and will document in its final <br />reports to the IBP specific green strategies which were implemented during site activities. <br />6.0 Documentation <br />6.1 Reporting <br />All work completed by Heartland will be done in accordance with all federal, state and local <br />safety and health regulations. All paper copies of reports, schedules or other documentation will <br />be provided on recycled paper. Two (2) copies of all final reports will be provided to the IBP along <br />with two (2) digital copies on compact disc. In addition, necessary print copies and/or digital copies <br />will be generated and submitted to IDEM and the site owner, as appropriate. <br />6.2 Invoicing <br />Project work will be invoiced on a phased invoicing cycle. Heartland will provide the IBP with <br />one invoice upon completion of each site activity, including completion of initial subsurface <br />investigative activities, completion of remedial activities, completion of monitoring well <br />installation activities and completion of quarterly monitoring events. Heartland will work closely <br />with the 1BP to ensure a streamlined invoicing system is adhered to. <br />