My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Indiana Finance Authority Indiana Brownsfield Program
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - Indiana Finance Authority Indiana Brownsfield Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:13:40 PM
Creation date
9/25/2019 3:26:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e � �t s for Pro xmis for E",n rfirr nnienud Assessment. Underground and Sionaec Tank Rcanova! ,ind Remedi aiio n <br />Services. Former Steve"s Marathon Service Sialion 9 adhlw in South 13,ent➢ Imfiana LIg 1120➢907-➢51 ��-Page 14 <br />o Vehicles will include personal use cars and trucks and heavy equipment, including <br />excavators, loaders and bobcats. <br />• Recycling containers will be placed onsite to recycle any and all appropriate waste <br />generated during site activities. Furthermore, any personal food items brought onsite must <br />be brought in reusable containers and/or recyclable containers to minimize onsite waste <br />generation; <br />• Local trucking companies will be utilized to minimize mobilization travel and decrease fuel <br />consumption and carbon emissions; <br />o Trucks entering the site and awaiting loads will be asked to shut vehicles off and not <br />idle while truck loading is ongoing. <br />• Should soil over -excavation be determined necessary, soils that are determined to be clean <br />will be segregated and stockpiled for reuse as backfill; <br />• Soils removed offsite for disposal will be trucked to local landfill sites within the nearest <br />proximity to the site. For purposes of this project, Heartland anticipates trucking soils to <br />Prairie View Landfill in Wyatt, Indiana, located approximately 20-miles from the site; <br />• Local sources (within 15 miles from the site) will be utilized to import clean backfill <br />material, if determined necessary; <br />• When appropriate, Heartland will utilize its staff hybrid gasoline/electric vehicles (Toyota <br />Prius or similar vehicle) to conduct field activities at times when large transport of field <br />equipment is not necessary. Please note Heartland will man this project from its South Bend, <br />Indiana office, located approximately 5 miles from the project site. <br />In addition to these green strategies, Heartland will require its subcontractors, including drilling and <br />laboratory subcontractors, to follow green principles. Heartland's drilling subcontractor will be <br />implementing the following activities: <br />• Idling of vehicles will not be permitted; <br />• Zero waste generation goals will be in place, with care taken to recycle any generated <br />waste during site activities; <br />• Water usage will be kept to a minimum, with care taken to replace decontamination water <br />when appropriate and to minimize spillage while decontamination of equipment is <br />occurring. All used decontamination water will be containerized for disposal in reusable <br />55-gallon steel drums. <br />Heartland will be working with Pace as its laboratory subcontractor for this project. Pace has <br />implemented the following green initiatives as part of its overall corporate strategy: <br />• Pace is a paperless laboratory, providing digital copies of final laboratory reports and <br />using online tools to provide customers with access to laboratory documents. By being <br />paperless, Pace uses less paper, printer toner and energy due to the lack of printers and <br />copiers being run; <br />• Pace has implemented technological advances to allow for minimizing sample volume <br />necessary to run specific analytic methods. Reduction of sample volume allows for less <br />
The URL can be used to link to this page
Your browser does not support the video tag.