My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:04:42 PM
Creation date
9/25/2019 3:18:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Road Reconstruction of Olive Street <br />FROM PRAIRIE AVENUE TO TUCKER DRIVE <br />MAINTENANCE OF TRAFFIC <br />UNITED <br />Consulting — <br />The most current plan set details three phases of construction. Access to all homes, businesses and Calvert Street are to <br />be maintained at all times, along with emergency vehicles and postal access. All truck traffic, except deliveries to local <br />businesses, are to use Prairie Avenue/SR 23 from the south during Phase I and Phase II construction. <br />Phase I includes the reconstruction of Olive Street and the installation of new storm sewer main and structures in the <br />northbound half of Olive Street from Prairie Avenue to the Norfolk Southern Railroad south of Tucker Drive. One-way traffic <br />northbound on Olive Street will utilize the existing southbound section of pavement during this phase. During this phase, <br />traffic will utilize the posted detour route along Sample Street and Prairie Avenue/SR 23. <br />Phase III includes the reconstruction of the southbound half of Olive Street and the installation of new storm sewer structures <br />from Prairie Avenue to the Norfolk Southern Railroad south of Tucker Drive. One-way traffic northbound on Olive Street will <br />utilize the newly constructed northbound section of pavement during this phase. The intersection of Indiana Court will also <br />be constructed in multiple phases to allow access to Olive Street from the west. During this phase, traffic will utilize the <br />posted detour route along Sample Street and Prairie Avenue/SR 23. <br />Phase III Olive Street shall be open to traffic in both directions. This phase includes any remaining work that was not <br />required to be completed in phase I and 11, but will be completed under traffic. <br />LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES I UNITED CONSULTINGPAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.