My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Larson Danielson Construction - 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Larson Danielson Construction - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 8:49:00 AM
Creation date
9/25/2019 3:06:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
entrances and curbs attached to <br />commercial sidewalks, will be installed <br />and maintained during concrete pours by <br />Ironworkers. Excluding all curbs and <br />residential sidewalks, but not excluding <br />retaining walls. <br />When using a fork truck or grad -all, to <br />Perform ironworkers work, a minimum <br />Of two (2) ironworkers will be employed, <br />one of which may be an apprentice, upon <br />the approval of a Union representative <br />of Local 395. <br />DRINKING WATER, RESTROOMS, <br />CLOTHES & EYEGLASSES <br />Section 1V". Employer shall furnish i <br />sanitary bottled drinking water, <br />including ice when the temperature <br />reaches 65 degrees or more, or when <br />needed to cool the personnel under <br />special conditions recognized by the <br />contractor and the Union, at all times. <br />Each job of sufficient size and length <br />67 <br />shall provide a change trailer that will <br />have access through two (2) separate <br />entries. A thirty-six inch (36") clear <br />walkway for access and exit, within the <br />trailer, will be provided. Landings and <br />stair's will be provided and will comply <br />with OSHA Regulations. Trailers will. <br />be of adequate size and number to <br />accommodate the amount of Ironworkers <br />on the job. Tending crafts may utilize the <br />same trailer facility as Ironworkers. <br />Ironworkers will not be required to <br />utilize trailer facilities that are <br />predominately occupied by other crafts, <br />but shall be provided adequate facilities <br />of size and number. Trailers will be <br />equipped with sufficient tables and <br />seating for lunch purposes. Trailers will <br />be capable of supplying adequate heat <br />and cross ventilation as needed plus <br />appropriate illumination. All openings, <br />doors and windows, will be screened. <br />Toilets of a clean and adequately <br />
The URL can be used to link to this page
Your browser does not support the video tag.