My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - JPR Corp - On Call Land Surveying and ROW Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - JPR Corp - On Call Land Surveying and ROW Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:39 PM
Creation date
9/25/2019 2:53:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3) 4502 South Michigan Street Easement (COMPLETE): JPR was requested to <br />prepare an easement for the City's existing sanitary sewer located on private <br />property. <br />4) Privet Lane Topographic Survey (CURRENT/ACTIVE): JPR was requested to <br />prepare a topographic survey for the failing structure located on Privet lane. This is <br />an active project. <br />5) Laurel Woods Structure Survey (CURRENT/ACTIVE): JPR was requested to <br />collect existing structure data for various structures in the Laurel Woods area for <br />determining issues with existing storm drainage. This is an active project. <br />6) Nimtz Parkway Boundary Survey/Easement Preparation (CURRENT/ACTIVE): <br />JPR was requested to prepare a boundary survey and easement description for a City <br />owned parcel for the Nimtz Parkway Retention Basin. This is an active project. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />c. The responsibilities of Owner are modified as follows: <br />d. For the Additional Services or the modifications to services set forth above, Owner shall <br />pay Engineer the following additional or modified compensation: <br />Construction Documents $6,000.00 <br />Total Additional Services Request $6,000.00 <br />e. The schedule for rendering services is modified as follows: <br />f. Other portions of the Agreement (including previous amendments, if any) are modified <br />as follows: <br />3. Agreement Summary (Reference only) <br />a. Original Agreement amount: $10,0(10.00 <br />b. Net change for prior amendments: $0.00 <br />c. This amendment amount: $6 000.00 <br />d. Adjusted Agreement amount: $16,000.00 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Page 2 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.