Laserfiche WebLink
Task 9 — As-Builts <br />Engineer shall coordinate and verify as needed the final construction documents for the Owner, <br />of completed small drainage project. Engineer shall provide in CAD, PDF, or other methods, as <br />directed by the Owner, all documents related to each project area. Completion: Dec. 4, 2020 <br />{Phasing: <br />Phase I — south area. <br />1). Preparation of topographic survey for Phase I and Phase II areas; <br />2). Preparation of preliminary drainage design for Phase I area; <br />3). Cost estimate for Phase I drainage work; <br />4). Evaluation of Phase I with City Engineering staff, <br />Phase II — north area. <br />1). Preparation of preliminary drainage design for Phase II area; <br />2). Cost estimate for Phase 11 drainage work; <br />3). Evaluation of Phase II with City Engineering staff, <br />4). Evaluations of Phase 11 and Phase I for additional work or finalize plans as directed by <br />City Engineering staff; <br />