My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Danch Harner & Assoc - Small Drainage Design and Repair Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - Danch Harner & Assoc - Small Drainage Design and Repair Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:07 PM
Creation date
9/11/2019 9:25:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 9 — As-Builts <br />Engineer shall coordinate and verify as needed the final construction documents for the Owner, <br />of completed small drainage project. Engineer shall provide in CAD, PDF, or other methods, as <br />directed by the Owner, all documents related to each project area. Completion: Dec. 4, 2020 <br />{Phasing: <br />Phase I — south area. <br />1). Preparation of topographic survey for Phase I and Phase II areas; <br />2). Preparation of preliminary drainage design for Phase I area; <br />3). Cost estimate for Phase I drainage work; <br />4). Evaluation of Phase I with City Engineering staff, <br />Phase II — north area. <br />1). Preparation of preliminary drainage design for Phase II area; <br />2). Cost estimate for Phase 11 drainage work; <br />3). Evaluation of Phase II with City Engineering staff, <br />4). Evaluations of Phase 11 and Phase I for additional work or finalize plans as directed by <br />City Engineering staff; <br />
The URL can be used to link to this page
Your browser does not support the video tag.