My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 08-03-61
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1960-1969
>
1961
>
RM 08-03-61
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 3:20:14 PM
Creation date
9/5/2012 3:54:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. PROGRESS REPORT - Continued <br />sion. The amendment states that the Contractor will <br />notify the Water Works Department of its intent of <br />demolition. The Contractor shall then shut off the <br />water service to said building at the curb, where the <br />water main will continue in use after redevelopment, <br />and in the basement where the main will be abandoned. <br />The Contractor shall also cap the existing sewer pipe <br />in the basement wherever the sewer is to be abandoned, <br />and between the sidewalk and the curb where the sewer <br />is to e used after redevelopment. Motion was made to <br />this e fect by Mr. Williams, seconded by Mr. Place and <br />unanim usly carried. <br />It was decided by the Commission that Mr. Louis and Contact <br />Mr. Sucher contact the Housing Authority about our With <br />Relocation problem. They will try to influence the Housing <br />Housing Authority to incorporate more four and five Authority <br />bedroon units in their next housing project. <br />Mr. Ko Zan moved that the meeting adjourn, Mr. Place seconded it <br />and it as unanimously carried. <br />Meeting adjourned at 11 :50 a.m. <br />s G1. Lot%'; President <br />
The URL can be used to link to this page
Your browser does not support the video tag.