Laserfiche WebLink
Area #3 <br />it would <br />However, t <br />contemplate <br />adequate si <br />s the advantage of the project cost being within a year's ceiling, and <br />ilitate relocation. <br />sere is a time limit to consider in Area #2, since the School has a <br />d construction target date of around 1960 and is in urgent need of an <br />After a bri f discussion of the above areas, a motion was made by Mr. Place <br />and second d by Mr. Louis to proceed with the Survey & Planning Application for <br />Area #Z, a d it was unanimously adopted. <br />4 . AIlAP411( A -EII®nA ]FOR Q'ECTICON ZZ11 ((FEKQ) HOW n]ING <br />This is a special provision under FHA regarding Relocation Housing for families <br />displaced by Renewal or any other public works. It requires an application by the <br />Mayor to the HHFA - stating an estimate of dwelling units needed for relocation <br />on projected Renewal work„ <br />A prerequi ite for this application is the Workable Program, which we have already <br />had approv d. It will be a few months before all approvals are obtained, and <br />consequentl , would be wise to apply now. <br />It was gene ally agreed it be suggested to the Mayor that application for 75 units <br />of Section 2 1 (FHA) Housing be made. <br />5 . S;tIIIa*zy awzsirII®IlnmA1 &z flQ,mfl oxy <br />Mr. Sucher reported that field work on the survey of families had been completed.. <br />Approximately 160 families in the area want project housing, while the others <br />want to buy their homes. This seems unrealistic in some cases, however, because <br />several of fliese people are presently out of work, and it would be difficult for them <br />to obtain to ns (although most of them own their own homes). <br />Very few fa ilies in the area are interested in private rentals, which will make <br />matters a little easier, because private rentals are difficult to obtain, especially <br />for non -whi a families. <br />Our key pr( <br />the people <br />depend on t: <br />important r <br />would becoi <br />blem in the whole project is if we can be ready in time to relocate <br />t the opening of the public housing project, because otherwise we would <br />e turnover in public housing, which is usually very slow. This is an <br />:ason why our project should not be delayed, as the relocation problem <br />ie increasingly difficult should our timing be off. <br />