Laserfiche WebLink
Performance <br />Services <br />tools, and desire to deliver 100% customer satisfaction and exceptional project value. We believe that <br />great relationships make great work possible. Our project managers take the responsibility of delivering <br />a construction project very seriously and begin each new project with the end in mind: a quality result <br />and a satisfied customer. <br />Effective communication with the City of South Bend and facilities staff will be a key factor in the overall <br />success of the project. Priorities of Tim Short, your dedicated PSI PM, will be: <br />1. Development of the Implementation Schedule as well as the accompanying strategy to <br />effectively complete the schedule. <br />2. Serving as the single point of contact to the owner's representative throughout installation and <br />provide continuous communications regarding the status of the project. <br />3. Minimizing any disruption of normal activities for the staff. <br />4. Successfully completing the project in a timely manner as outlined in the agreed project <br />schedule. <br />5. Holding regularly scheduled progress meetings to ensure customer expectations are fully met. <br />Quality Assurance and Commissioning <br />Quality Assurance <br />Our goal is to utilize high -quality equipment to meet the performance specifications of the project. We <br />have excellent working relationships with top quality manufacturers, their representatives, and their <br />respective product and equipment lines. Our systems are designed with the highest quality parts, <br />oversized equipment and meet all standards, not just local but national NABCEP standards as well. <br />Additionally, we utilize commissioning, which is described below to ensure all systems are installed <br />properly and working as predicted. Our Performance Assurance department monitors the energy output <br />to ensure the system is creating the projected savings. In this way, we ensure high -quality projects. <br />Project Commissioning <br />Performance Services will oversee the commissioning of the solar energy system to ensure it is set up to <br />operate as intended and as required to achieve the projected savings. During the final design and <br />construction phases, Performance Services shall develop testing, commissioning, and start-up <br />procedures for the equipment, components, and systems installed. These procedures shall be in <br />accordance with the manufacturers' guidelines, system performance objectives, and sequences of <br />operation. Additionally, Performance Services will provide training and instruction for the operation and <br />maintenance of the system. <br />Performance Services will provide and be responsible for the commissioning and start-up of all solar <br />energy systems at the City of South Bend. This is accomplished as a continuation with the same team <br />that developed, constructed, and engineered the project through installation. Because we guarantee <br />energy savings, Performance Services has a vested interest that all systems work as designed and <br />produce the intended results. The commissioning planning process begins during the project <br />development phase and is finalized during the implementation phase. <br />Confidential & Proprietary Document 8. Project Management Approach - 2 <br />