My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Performance Services Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Performance Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:22:03 PM
Creation date
8/28/2019 11:13:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Penn -Harris -Madison School Corporation Phase IN <br />After conducting a preliminary facility improvement study for Penn <br />Harris Madison Schools, Performance Services identified several learning <br />environment issues including high CO2 and humidity levels, <br />temperatures, and high classroom noise levels. A direct result of obsolete <br />control systems and system components that exceeded their expected <br />useful life, Performance Services identified solutions that allowed each <br />school to significantly reduce energy usage and create optimal classroom <br />learning environments. <br />Learning Environment Integrated Energy and Learning Solutions <br />SQUARE FT: <br />1,431,191 S.F. <br />Energy Efficiency Replaced domestic hot water heaters and heat pumps <br />CONTRACT TOTAL: <br />Installed high efficiency boilers <br />$6,314,931 (All Phases) <br />Rebuilt cooling towers and converted to variable <br />START DATE: <br />volume <br />2008-2010 <br />Replaced electric water heaters with gas <br />COMPLETION DATE: <br />Indoor Air Quality Replaced under -sized ventilation units with new heat <br />2009-2012 <br />recovery make up air units to increase air quality <br />Installed CO2 sensors to measure and ensure levels <br />STATUS: <br />All Phases in the 7th <br />are below 1000 PPM with outside air dampers at <br />Year of Monitoring <br />minimum position <br />Temperatures Upgraded obsolete controls to open protocol system <br />ANNUAL ENERGY AND <br />OPERATIONAL SAVINGS: <br />Annual Energy Savings Results: <br />$861,248 - 890,129 kWh <br />and 20,500 therms of <br />Year 1: $891,601 - 897,055 kWh and 26,183 therms of gas <br />gas <br />Year 2: $890,476 - 893,029 kWh and 26,183 therms of gas <br />Year 3: $890,476 - 893,029 kWh and 26,183 therms of gas <br />Year 4: $890,476 - 893,029 kWh and 26,183 therms of gas <br />Year 5: $913,913 - 893,892 kWh and 26,183 therms of gas <br />Year 6: $906,026-893,892 kWh and 26,183 therms of gas <br />Cumulative: $5,382,968 - 5,363,926 kWh & 157,098 therms <br />"P-H-M has been pleased with the level of expertise of the Performance Services staff, <br />the detailed follow-up, and the professionalism of their workers. We were assigned two <br />key personnel that have been constant in our working relationship. They understand <br />CONTACT: <br />what we are trying to achieve and help us get there:" <br />Dr. Jerry Thacker <br />Denise D. Seger, Ph.D. <br />ASSOCIATE SUPERINTENDENT, PENN-HARRIS-MADISON SCHOOL CORP <br />Superintendent <br />(574) 259-7941 <br />We are a Design -Build engineering and construction company specializing in creating high -efficiency buildings with optimal learning and working environments. <br />By valuing relationships and workmanship over change orders and shortcuts, Performance Services strives to earn a 100%Customer Satisfaction rating. <br />Rat <br />o 4:0 > M�, <br />��� <br />Performance Services � <br />
The URL can be used to link to this page
Your browser does not support the video tag.