Laserfiche WebLink
AMERESCO40 <br />"het ficatiom of Savings — The savings for this ECM were reviewed following the ECM Construction and <br />Performance Verification plan as defined in Exhibit G-1 of the Amendment. The savings have been achieved <br />based on completion of the upgrade. Upon delivered functional capability as documented during the <br />commissioning and closeout process, the savings associated with the chiller replacement were deemed <br />achieved. <br />The new chillers were commissioned during project closeout to confirm that they are functioning as intended. <br />The project site was surveyed to confirm that the equipment was installed in conformance with the Scope of <br />Services. <br />During the site visit that Ameresco performed on August 22"d, 2018, the equipment was visually inspected to <br />ensure that it has the ability to maintain the persistence of savings. <br />New Chiller <br />Hendricks Counly,IN <br />New Chilled Water Pumps <br />March 2011". 2019 <br />City of South Bend — August 27, 2019 <br />Taf'Pe content is subject to Confidentiality Restrictions" <br />47 11. Measurement & Verification <br />