My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:19:26 PM
Creation date
8/28/2019 11:10:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO40 <br />"het ficatiom of Savings — The savings for this ECM were reviewed following the ECM Construction and <br />Performance Verification plan as defined in Exhibit G-1 of the Amendment. The savings have been achieved <br />based on completion of the upgrade. Upon delivered functional capability as documented during the <br />commissioning and closeout process, the savings associated with the chiller replacement were deemed <br />achieved. <br />The new chillers were commissioned during project closeout to confirm that they are functioning as intended. <br />The project site was surveyed to confirm that the equipment was installed in conformance with the Scope of <br />Services. <br />During the site visit that Ameresco performed on August 22"d, 2018, the equipment was visually inspected to <br />ensure that it has the ability to maintain the persistence of savings. <br />New Chiller <br />Hendricks Counly,IN <br />New Chilled Water Pumps <br />March 2011". 2019 <br />City of South Bend — August 27, 2019 <br />Taf'Pe content is subject to Confidentiality Restrictions" <br />47 11. Measurement & Verification <br />
The URL can be used to link to this page
Your browser does not support the video tag.