Laserfiche WebLink
AMERESCO40 <br />flow Sa+vin s Were DeteLmIned - The energy savings for the Government Center Boiler Replacement were <br />calculated using eQUEST, which is a DOE2 energy simulation software. The baseline eQUEST input file details <br />the building components, occupancy schedules, lighting schedules, equipment efficiencies, etc, in order to <br />establish the building's baseline energy consumption. The modeled energy consumption was compared to, <br />and adjusted to match, the actual utility bill data. Modifications were then made to the baseline energy model <br />to simulate the energy savings that result from installing a new high efficiency boiler plant. Savings were also <br />calculated for implementing an efficient hot water boiler reset schedule. <br />The results of the savings calculated by the eQUEST energy model are shown below. The calculated energy <br />usage reduction values are higher than the guaranteed amount due to the application of safety factor. <br />New Boiler <br />N� <br />e m <br />� �Ip�IC)ANjqMKMWd <br />5111}B;II�JtlJpl" <br />�l>A1NkM�Ng1 <br />u w r <br />"31 <br />January <br />55,390 <br />55,580 <br />190 199 <br />199 <br />0 <br />6,439 5308 <br />February <br />50„360 <br />50,530 <br />470) 1 168 <br />168 <br />(0) <br />5,510 4,720 <br />790 <br />March <br />63,330 <br />63,530 <br />(200) 220 <br />220 <br />)I•) <br />5,230 4,317 <br />913 <br />April <br />71,500 <br />'.. 71.720 <br />220 <br />216 <br />217 <br />(11 <br />4„884 <br />3,925 <br />959 <br />May <br />80,850 <br />81,100 <br />750) <br />1 257 <br />258 <br />(0) <br />4,583 <br />3,471 <br />1,112 <br />lone <br />100,300 <br />100 60 <br />f260 <br />266 <br />266 <br />(0) <br />3,460 <br />2,449 <br />1 11 <br />July <br />106,360 <br />106,620 <br />260) <br />1 266 <br />767 <br />(0) <br />3,328 <br />2,305 <br />1,023 <br />August <br />147,970 <br />103,190 <br />(270) <br />270 <br />270 <br />1 (0) <br />1 3,569 <br />2,524 <br />1,045 <br />5e [ember <br />89870 <br />90120 <br />250) <br />256 <br />257 <br />0 <br />3863 <br />12 <br />1,051 <br />October <br />74440 <br />74,670 <br />230 <br />238 <br />238 <br />0 <br />5,01.3 <br />4021 <br />992 <br />November <br />57,650 <br />57,850� <br />(2.0.0) <br />223 <br />223 <br />(1) <br />5,170 <br />4,280 <br />890 <br />December <br />S5 560 <br />55 740 <br />(180) <br />139 <br />139 <br />0) <br />5,924 <br />5,061 <br />863 <br />'rota, <br />908,530 <br />911,2 LO <br />12,6801 <br />226 <br />227 <br />151 <br />57.073 <br />45,493 <br />11,580 <br />Verification of Savings - The M&V approach for the Boiler Replacement ECM is based on FEMP Option A - <br />Retrofit Isolation with Key Parameter Measurement, The key parameter for this ECM is combustion efficiency <br />for the new boilers, which was spot measured one (1) time post installation. Once the combustion efficiency <br />data was acquired, Ameresco took the average efficiency of both boilers at 601/6 load and above, which is when <br />the majority of the natural gas is consumed. The above 60%load average efficiency is 90.769/o, which is slightly <br />more efficient than the assumed efficiency used in the eQUEST model of 90.09%. This value was inserted into <br />the eQUEST energy model to calculate the achieved savings. <br />The boiler measurement data provided by the boiler contractor, and a summary of the actual savings as <br />calculated by the energy model, are shown on the following pages. Note: The guaranteed and actual gas <br />savings are less than the calculated energy savings due to the application of a safety factor. <br />Hendricks Coun�, IN March 201h, I <br />City of South (Bend •-- August 27, 2019 43 11. Measurement & Verification <br />Taqe content is subject to Confidentiality Restrictions" <br />