My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:19:26 PM
Creation date
8/28/2019 11:10:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERESCO4 <br />Government Center Boiler Replacement <br />Two (2) existing boilers were removed completely and replaced with two (2) new 1.4 MMBTU input high <br />efficiency condensing hot water boilers with Weishaupt America burners. Additional work associated with the <br />boiler replacements included: <br />• Two (2) new variable frequency drives (VFD) <br />• Two (2) new hot water pumps <br />• One (1) double wall brazed plate and frame heat exchanger <br />• New gas piping in the boiler room to accommodate single point connection to gas train on new <br />boilers <br />• Fiberglass insulation with vinyl PVC wrapping <br />• Stainless steel flues <br />• A boiler management system administration panel <br />• One (1) new domestic hot water heater <br />New Condensing Boilers <br />New Stainless -Steel Flues <br />New Hot Water Pump VFD <br />% / ! /r /.�/ rr <br />/// ,l <br />�� �a { <br />i//l//////%///i, rivii//li/o/i//�%ii <br />Hendricks Counly, IN March 201il, 2019 <br />City of south Bend — August 27, 2019 42 11. Measurement & Verification <br />"Facie content is sublet to Confidentiality Restrictions" <br />
The URL can be used to link to this page
Your browser does not support the video tag.