My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:19:26 PM
Creation date
8/28/2019 11:10:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Energy Performance Contracting Services Green a Clean u>ta�nabl <br />�,U <br />Each M&V option is applicable to specific situations, and oftentimes, more than one option is <br />possible. Multiple options may be used on a single project. The general approach to <br />determining energy savings in these four options involves comparing the energy use <br />associated with a certain energy consuming system within a facility, or the energy use of an <br />entire facility, before installation of the ECM (baseline) and after installation of the ECM (post - <br />installation). Determining energy savings for only a certain energy consuming system within a <br />facility is accomplished with the retrofit -isolation methods. These methods allow for an accurate <br />assessment of only the energy consumption associated with a defined measure. <br />Ameresco bases all of its site -specific savings development and Measurement and Verification <br />(M&V) Plans on the International Performance Measurement and Verification Protocols <br />(IPMVP). The general approach to determining energy savings in these plans involves <br />comparing the energy use associated with a facility, or certain energy -consuming systems <br />within a facility, before installation of the cost reduction measure (baseline) and after installation <br />of the ECM (post -installation). The equation for calculation of energy savings is stated below: <br />Energy Savings = Baseline Energy Consumption — Post Retrofit Energy Consumption t Adjustments <br />The specific savings analyses vary from measure to measure but they can all be broken down <br />into usage before and after installation of the ECM. Sometimes the baseline usage is fixed, <br />while in other cases the baseline is calculated based on the post -installation usage; it depends <br />on the specific plan used to verify the performance of the measure. It is our intent to provide <br />energy savings calculation methodologies appropriate for this project. <br />c. Provide a Measurement and Verification Plan and Annual Savings Report from a recent <br />project. <br />Please find the attached M&V plan and report for Hendricks County, IN. <br />City of South Bond August st "7, 2019 31 11. Measurement & Verification <br />"Flane content is subject to Confidentiality Restrictions" <br />
The URL can be used to link to this page
Your browser does not support the video tag.