Laserfiche WebLink
a. Describe your strategies for acquiring competitive pricing on solar panels and components for <br />your customers. <br />Ameresco is an industry leading provider of distributed energy systems, which has resulted in our <br />firm establishing existing supply arrangements. Our terms and conditions with module, inverter, <br />racking, and data acquisition system providers reflect the most competitive cost and warranty <br />terms to ensure a lifespan of more than 35 years for the proposed rooftop system. <br />b. Describe your firm's standards and best practices for selection of solar technology (e.. <br />quality, warranty) <br />Ameresco is an owner and operator of distributed energy solar systems across the country. Our <br />firm regularly analyzes the quality control and financial stability of all of our vendors. This ensures <br />the system incorporates the most proven products, and the vendor has the viability to support the <br />warranty behind their products. All the proposed equipment in our proposed design are part of <br />BNEF's Tier 1 rated equipment manufacturers, which reflects a rigorous investigation of the <br />manufacturing processes, products, and financial stability. Our team has proposed equipment that <br />our firm would own, operate, and manage for a useful life beyond 35 years. <br />c. Provide anticipated or example market pricing in per installed Watt for commercial rooftop <br />projects 75-200 kW, based on projects your firm has been involved in over the past three <br />years. <br />The following is a preliminary cost summary for a proposed system at this location (Confidential): <br />......... <br />PV Capacity (kW -AC) <br />840 <br />PV Capacity (kW -DC) <br />If)9 0 <br />PV Capacity (Watts -DC) _ <br />109,000 <br />PV Generation Output kWh <br />;,800 <br />kWh/kW <br />1,044.0 <br />EPC Cost <br />PDC Costs <br />Cost <br />% of Total Cost Co Matt <br />Project Development Costs (Includes Legal) <br />0.0% $ - <br />Developer Fee <br />0,0%$ <br />Third -Party Development E)penses reimbursement <br />0.0% $ - <br />Design and Construction Cost <br />Engineering and Project Mana ement Costs 8.7% $ 0.18 <br />Consultants <br />0.0% <br />$ <br />Major Equipment and Materials <br />1; 4 1 ^a+,"'> <br />18.2% <br />$ 0.39 <br />Site Preparation <br />0.0% <br />$ <br />Electrical Subcontractor (BOS, Labor, Bond, and Permits) <br />I +''i ''AM <br />70.7% <br />$ 1.50 <br />Interconnection and Utility <br />0.0% <br />$ <br />Bldg Permit <br />0.0% <br />'$ <br />Other Balance of System Costs <br />0,0% <br />$ <br />Contingency <br />�� a^'�"d' <br />w 2,4% <br />$ 0.05 <br />Total Design and Construction Cost <br />231,102 <br />100.0% <br />2.12 <br />Ameresco GC/GR <br />25,678 <br />11,1% <br />$ 0.24 <br />Total EPC Cost Includin Ameresco Margin <br />256,780 <br />111,1% <br />2.356 <br />ky of South IEGend ._ August 27, 2019 29 10. Solar Technology and Pricing <br />"Ii'aqe coMer 1. is :yaakrped..to Confida;n iellottV Restrictions" <br />