My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
08-30-12 Packet
>
6E(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:09:20 PM
Creation date
8/29/2012 9:53:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C � <br />CHRISTOPHER B. BURKE ENGINEERING, LLC <br />220 West Colfax Avenu Suite 500 South Bend, IN 46601 TEL (574) 282 -8001 FAX (574) 282 -8003 <br />August 10, 2012 <br />Michael <br />Mecham, P.E. <br />City of <br />South Bend <br />Divisi <br />n of Engineering <br />13`h F <br />oor County -City Building <br />Sout <br />Bend, IN 46601 <br />Subje t: 5 Points Utility Study <br />Professional Services Proposal <br />Dear Mr. Mecham: <br />Christ pher B. Burke Engineering, LLC ( CBBEL) is pleased to provide this proposal for professional <br />engin ?ering services related to the 5 Points Utility Study in the City of South Bend. The following is <br />our u iderstanding of the assignment, scope of services and estimated fee in support of the <br />proje t. <br />As we <br />Inters( <br />will de <br />UNDERSTANDING OF THE ASSIGNMENT <br />understand it, the City's objective is to maximize development area at the new 4 Points <br />ction that will be created with the realignment of SR23 at Corby and Eddy Streets. CBBEL <br />termine potential realignments of existing utilities to help maximize developable area. <br />SCOPE OF SERVICES <br />CBBEL�will complete the following tasks to meet the project objectives as described in the RFP and <br />clarifie during our meeting on August 7, 2012: <br />Task 1 — Existing Utility Coordination and Confirmation: CBBEL will coordinate and meet with the <br />typical utility companies within the project area (shown on Exhibit A, attached) to collect utility <br />locations and as -built plans in order to accurately show them on the existing utility plan. This task <br />will in dude a site visit to confirm the visible utilities match the provided information. An existing <br />utility plan will be produced for the site. <br />EC ristopher B. Burke Engineering LLC City of South Bend: 5 Points Utility Study <br />3 2 12.5989 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.