My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - American Structurepoint, Inc. - Poppy Road-US 20 Lift Station Force Main Repair Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - American Structurepoint, Inc. - Poppy Road-US 20 Lift Station Force Main Repair Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:02:26 PM
Creation date
8/28/2019 10:43:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-2: Basic Services — Standard Hourly Rates <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation For Basic Services (other than Resident Project Representative) —Standard Hourly <br />Rates Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. An amount equal to the cumulative hours charged to the Project by each class of Engineer's <br />personnel times Standard Hourly Rates for each applicable billing class for all services <br />performed on the Project, plus Reimbursable Expenses and Engineer's Consultants' charges, <br />if any. <br />2. Engineer's Reimbursable Expenses Schedule and Standard Hourly Rates are attached to this <br />Exhibit C as Appendices I and 2. <br />3. The total compensation for services under Paragraph C2.01 is estimated to be $41,200 <br />based on the following estimated distribution of compensation: <br />a. Study and Report Phase <br />N/A <br />b. Preliminary Design Phase <br />$28,270 <br />c. Final Design Phase <br />$1,230 <br />d. Bidding or Negotiating Phase <br />$3,700 <br />e. Construction Phase <br />$7,300 <br />f. Post -Construction Phase <br />$700 <br />4. Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See also C2.03.C.2 <br />below. <br />Page 1 <br />Exhibit C —Compensation Packet BC-2: Basic Services (other than RPR) — Standard Hourly Rates Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright C 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.