Laserfiche WebLink
N. If more than one prime contract is to be awarded for the Work designed or specified by Engineer, <br />designate a person or entity to have authority and responsibility for coordinating the activities <br />among the various prime Contractors, and define and set forth the duties, responsibilities, and <br />limitations of authority of such individual or entity and the relation thereof to the duties, <br />responsibilities, and authority of Engineer as an attachment to this Exhibit B that is to be mutually <br />agreed upon and made a part of this Agreement before such services begin. <br />O. Attend the pre -bid conference, bid opening, pre -construction conferences, construction progress and <br />other job related meetings, and Substantial Completion and final payment visits to the Project. <br />P. Provide the services of an independent testing laboratory to perform all inspections, tests, and <br />approvals of samples, materials, and equipment required by the Contract Documents, or to evaluate <br />the performance of materials, equipment, and facilities of Owner, prior to their incorporation into <br />the Work with appropriate professional interpretation thereof. <br />Q. Provide Engineer with the findings and reports generated by the entities providing services to <br />Owner pursuant to this paragraph. <br />R. Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />S. Perform or provide the following additional services: [Here list any such additional services]. <br />1. Submit advertisement for bids to the local newspaper as required by State Law and <br />departmental policy. <br />2. Maintain a set of plans and specifications for bidders to review. <br />3. Provide non -confidential information regarding the upstream industrial contributors to the <br />Poppy Road lift station. <br />4. Provide flow data available for the Poppy Road lift station. <br />5. Allow use of South Bend's GIS system to assit in the development of the design. <br />6. Provide as -built drawings from the most recent project at Poppy Lift Station. <br />7. Provide photographs of the line stop failure and materials used to affect a stoppage. <br />Page 3 <br />(Exhibit B— Owner's Responsibilities) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />•ight © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />