My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - American Structurepoint, Inc. - Poppy Road-US 20 Lift Station Force Main Repair Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - American Structurepoint, Inc. - Poppy Road-US 20 Lift Station Force Main Repair Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:02:26 PM
Creation date
8/28/2019 10:43:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Drawing for MOT of INDOT shoulder closure. Plans will be prepared overtop of the <br />existing lift station plans. Meet with Owner via conference call to review plans. <br />9. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />10. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost. <br />11. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />Lher°e list in itch ta.yk:y or &lN ?:yj le.y <br />a. Prepare and furnish bidding documents for review by Owner, its legal counsel, and <br />other advisors, and assist Owner in the preparation of other related documents. Owner <br />shall submit to Engineer any comments and, subject to the provisions of Paragraph <br />6.01.G, instructions for revisions. <br />12. Furnish 2 review copies of the Preliminary Design Phase documents including bidding <br />documents and any other deliverables to Owner within 45 calendar days of authorization to <br />proceed with this phase, and review them with Owner. Within 6 calendar days of receipt, <br />Owner shall submit to Engineer any comments regarding the Preliminary Design Phase <br />documents and any other deliverables. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A 1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, character, <br />or design requirements of or for the Project, and upon written authorization from Owner, Engineer <br />shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />, w . tlil i i <br />. goveniment' <br />to k rl le ,' J .,'y ,.'"".." J +ef it�l- (9Ri'rtk%Btif3 �s-�kt klt41 <br />llriti lffi�ts-hair si+l <br />-. . <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.