Laserfiche WebLink
• NSI will conduct an Installation Review meeting and verify the Project Plan including network design, equipment <br />delivery, installation times, and testing procedures. <br />Switching <br />• NSI will assemble the new equipment including installation of rackmount hardware, modules, and power supplies and <br />install the device in the existing equipment racks. <br />• NSI will physically install the new switching, SFPs, and fiber connections at the cabinets for the three intersection <br />locations <br />• NSI will configure the new switches according to the agreed upon design and cutover from the existing equipment. <br />The new equipment will take over handling production traffic. <br />• CoSB will provide access to the cabinets at the intersections where the switches are to be installed. <br />• CoSB will assist with testing verification with the onsite engineer once the switches have been installed <br />Wireless <br />• NSI will apply new licenses and upgrade the controller software for the proper function and support of the new 1560 <br />series access points. 801111 2f 11209 Agms regUirg r — this <br />time. NSI will validate the current running code to ensure that it will support the 1560s. The software upgrade may <br />not be necessary, but the controller will still need to be rebooted to support the newly added licenses. <br />• NSI will create a new Public WiFi and AP group for these access points if necessary. If it is acceptable to use existing <br />SSIDs or AP Groups for this deployment the access points will be configured to use those. <br />• NSI will configure hostnames for each AP based upon their location. <br />• NSI will verify that all new access points in this project are communicating with the controller, have updated their <br />software to the current deployed version, and are stable for testing/operation <br />• NSI will install and document the location of each access point by room number, name, and AP MAC address (3rd <br />Party Contractor) These access Points are to be installed as close to the center of the intersections as safely and stable <br />as possible. <br />• NSI will provide lift access if required for high AP cabling or Installation (if applicable) (3rd Party Contractor) <br />• CoSB will provide DHCP services for any new networks that are created. <br />T ing Res ansi `li i <br />Network -Wide <br />• NSI and CoSB will test access to the critical services identified in the testing plan. <br />Switching <br />• NSI will verify proper operation of the installed equipment as identified in the testing plan. At the completion of <br />testing all devices should be capable of passing traffic through their uplink port, being remotely managed, and have <br />had a backup copy of their configuration taken. <br />Wireless <br />NSI will verify proper operation of the installed equipment as identified in the testing plan. <br />NSI will adjust wireless signal settings to best provide coverage and service to wireless users. Access points may need <br />to be relocated to achieve optimal coverage. NSI will determine if a change order is required for additional services <br />associated with relocation of access points. <br />Infrastructure Final Deliverables <br />Following the completion of training and support, NSI and CoSB will review the work completed. As part of this review NSI will <br />provide the following: <br />Network -Wide <br />• NSI will provide documentation of the testing results including identified critical services, initial testing result, any <br />required corrective actions, and final testing results (where necessary). <br />www.nsil.com WIIY we do is as important as WHAT we do (574)271-0900 <br />