Laserfiche WebLink
00 <br />etwor <br />11,.'�s, �I ,,, l,�t{ <br />being consolidated and migrated into a new 5520 wireless controller. The setup of these new access oints will be <br />dependent on the network and controller migration to be completed. The access point licenses provided in this <br />updated design have been provided to provide support on the new 5520 controller and not the older 5508 controller <br />that is being phased out. <br />Implementation - Scope of Work <br />Network Solution Inc. views the successful completion of this project as a partnership between themselves and City of South <br />Bend. The following section provides the scope of work each is responsible for throughout different phases of this project. <br />PreparationPr Responsibilities; <br />Network -Wide <br />• NSI will conduct an internal kickoff meeting to review the purpose of the project, desired business outcomes, <br />proposed design, statement of work, stakeholders, equipment, team member requirements, and base scheduling. <br />• NSI will conduct an external kickoff meeting with CoSB to verify the purpose of the project, desired business <br />outcomes, proposed design, statement of work, stakeholders, equipment ordered, equipment delivery timelines, and <br />installation dates and timelines. <br />NSI will provide a project plan outlining the expected steps needed to accomplish the installation successfully with <br />minimum interruption. <br />Switching <br />• NSI will create the configuration scripts necessary to integrate the new switches into the DTSB Mertronet fiber <br />network. These scripts will be based on the configuration of the existing ME3400 switches that are in operation <br />• NSI will develop a preliminary testing plan that verifies normal operation of the installed networking equipment (i.e. <br />CPU utilization, memory utilization, traffic flow, remote access) <br />• NSI will provide the complete testing plan for CoSB to approve. <br />• CoSB will approve or modify the recommended design as needed. This will include verification of the IP addresses <br />used for management on the new switches to be installed. <br />• CoSB will provide an expected window of time that changes can be made to the network including those identified as <br />disruptive. <br />• CoSB will provide a list of critical services that must be functional in order for testing to be considered successful. <br />Wireless <br />• NSI will provide a recommended design for the wireless system deployment. Items addressed in this design may <br />include access point location and advanced wireless settings (data rate, bandwidth, and power). (NSI has created a <br />predictive AP placement report for this design) <br />• NSI will develop a preliminary testing plan that verifies normal operation of the installed networking equipment (i.e. <br />access points online, radio settings, remote access) <br />• NSI will review the available controller code versions and choose which version shall be recommended for the <br />necessary code upgrade <br />• CoSB will provide a list of SSIDs that should be available to users. This may be an existing SSID and AP group or a new <br />one if necessary. <br />• CoSB will approve or modify the recommended design as needed. <br />• CoSB will provide an expected window of time that changes can be made to the network including those identified as <br />disruptive. <br />• CoSB will provide a list of critical services that must be functional in order for testing to be considered successful. <br />rw <br />Network -Wide <br />www.nsil.com WHY we do is as important as W11AT we do (574) 271-0900 <br />