Laserfiche WebLink
twenty calendar days and completion of final landscaping. <br />(c) The permittee shall make regular inspections of all control measures in <br />accordance with 327 IAC 15-5-7. The purpose of such inspections will be to determine the overall <br />effectiveness of the control plan and the need for additional correctional measures. <br />Section 17-115. Project Termination. <br />The procedures for termination of construction activities shall be as described in 327 IAC <br />15-5-8 of Rule 5. <br />Section 17-116. Enforcement. <br />(a) The City of South Bend and any designated agent of the City shall have the <br />authority to enforce this Article. All persons engaging in construction activities on a project site <br />must comply with the approved ESCP for the project site and with the requirements, provisions and <br />regulations of this Article. Any person causing or contributing to a violation of any requirement, <br />provision, or regulation of this Article maybe subject to enforcement and penalty under the terms <br />of this ordinance. If the violation is of such a nature to materially adversely affect the public health, <br />existing water uses and aquatic biota of the City of South Bend, the City or a designated agent may <br />suspend or revoke the Site Development Permit and place an immediate "Stop Work Order" at the <br />site. <br />(b) Each action causing a violation will constitute a separate and single violation. <br />Each day that a violation exists constitutes a separate violation, and is subject to penalty or <br />prosecution as a separate violation. <br />(c) Any person performing land disturbing activities prior to submitting an ESCP for <br />approval by the City and properly notifying IDEM shall be subject to enforcement and penalty as <br />described in 327 IAC 15-5-10. <br />Section 17-117. Penalty Procedures. <br />(a) The City or a designated representative will employ the following procedures with <br />regard to assigning penalties to enforce the requirements, provisions and regulations of this <br />ordinance. <br />1. First Violation -means the initial determination of a violation or <br />group of violations at a project site. Upon ascertaining and documenting the <br />occurrence of a first violation at a project site, the City or designated representative <br />will make a corrective recommendation to the owner/developer responsible for <br />correcting the violation, together with a notice that the correction must be <br />accomplished within ten (10) working days after the issuance of the notice to prevent <br />the citation of a second violation with regard to the same condition or conditions that <br />caused the first violation. <br />2. Second Violation -means the determination that after ten (10) <br />