Laserfiche WebLink
Section 17-111. Construction Plan Requirements. <br />The Erosion and Sediment Control Plan (ESCP) requirements shall be as described in 327 <br />IAC 15-5-6.5 of Rule 5 and conform to the City of South Bend Drawing and Specification Standards, <br />latest edition. <br />Section 17-112. Storm Water Quality Control Requirements. <br />Storm water quality control measures included in the plan must achieve the minimum project <br />site requirements specified in 327 IAC 15-5-7 and 327 IAC 15-5-7.5 of Rule 5. The storm water <br />quality control measures shall conform to the City of South Bend Design Criteria, latest edition. <br />Section 17-113. Site Development Permit. <br />(a) No construction project site owner (permittee) shall be granted a Site <br />Development Permit for a project site where the proposed land disturbance is one (1) acre or more <br />without the approval of the ESCP by the MS4 Operator. <br />(b) The ESCP shall be submitted by the construction project site owner in triplicate <br />to the City of South Bend Engineering Department, Attn: MS4 Operator, 227 W. Jefferson <br />Boulevard, 1316 County-City Building, South Bend, Indiana 46601. <br />(c) The City of South Bend shall provide a copy of the ESCP to the local Soil and <br />Water Conservation District (SWCD) for their comments and recommendations. All comments <br />received by the local SWCD shall be made available to the applicant during the review and approval <br />process. <br />(d) Each ESCP submittal shall include the name, address and phone number of the <br />Owner or Developer of the site and any consulting firm retained by the applicant together with the <br />name of the applicant's principal contact at such firm. It shall also include a statement by the Owner <br />or Developer of the site that any land clearing, construction, or development involving the movement <br />of earth by any party on the project site shall be in accordance with the approved ESCP. Each ESCP <br />shall be accompanied by a $100 filing fee made payable to the City of South Bend. <br />(e) The Site Development Permit is granted by the MS4 Operator for a period of five <br />(5) years. Other provisions for duration of coverage shall be as described in 327 IAC 15-5-12. <br />Section 17-114. Inspection. <br />(a) The City of South Bend shall make inspections as required and either shall <br />approve that portion of the work completed or shall notify the permittee that the work fails to comply <br />with the approved ESCP. <br />(b) To initiate inspections, the permittee shall notify the MS4 Operator in writing, <br />at least two working days before the following: start of construction, completion of site clearing, <br />close of construction season, and commencement of work when the site has been dormant for at least <br />