Laserfiche WebLink
2) It is anticipated that the Engineer will attend two (2) construction meetings during the <br />construction period; <br />3) Based upon the on -site observations and evaluations of the Contractor's Applications for <br />Payment, assistance to the Client will be provided to determine the amounts due to the <br />Contractor; <br />4) The Engineer will provide clarification/interpretations of the Contract Documents if such <br />interpretations are necessary for the proper execution or progress of work; <br />5) The Engineer shall render written recommendations on claims, disputes and other matters <br />in question between the Owner and Contractor relating to the execution or progress of the <br />project as provided by the Contract Documents; <br />6) Review and approve, or take other appropriate action and forward to the Client for final <br />disposition, the Contractor's submittals such as Shop Drawings, Product Data and Samples <br />with respect to Contract Documents produced by the Engieer; <br />7) Prepare responses to Request for Information (RFI) provided by the contractor; <br />8) Prepare Change Orders for the Owner's approval and execution; <br />9) Provide field reports describing observations, problems and recommended solutions; <br />10) Provide punch lists based on site observations; <br />11) Conduct inspections to determine the date or dates of Substantial Completion and the date <br />of Final Completion; <br />12) Review and approve, or take other appropriate action on, the Contractor's list of items to be <br />completed or corrected. <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional <br />Services of the types listed below. <br />Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but <br />not limited to, changes in size, complexity, Owner's schedule, character of construction, or <br />method of financing; and revising previously accepted studies, reports, Drawings, <br />Specifications, or Contract Documents when such revisions are required by changes in <br />Laws and Regulations enacted subsequent to the Effective Date or are due to any other <br />causes beyond Engineer's control. <br />Page 19 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />