Laserfiche WebLink
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Roger T. Nawrot, PE & PLS, Assistant City Engineer Ah/ <br />SUBJECT: Wayne Street & Leighton Plaza Parking Structures Repairs 2019 <br />Project No. 119-048 <br />DATE: August 5, 2019 <br />mmm uuoumu mm�naRm�u uouuuuu� mmo iooimuMumirc�m�ooiomm�o�mrvmmoiwmum�mom�mmmmioioiomouummm�mu� mm �a�� i��uu�uuuuuuui �imsxaooum iu �ma..00 0000i� <br />On July 23, 2019, the Board of Public Works opened and read the bids for the above <br />project. There were two bids submitted. The Division of Engineering has reviewed them and <br />found them to be correct except that Berglund Construction Company did not bid on the two <br />alternates. <br />The bids ranked as follows: <br />The Division of Engineering recommends that the Board award the contract to D.C. <br />Byers Co./Detroit Inc.., the lowest responsive/responsible bid, which is the Base Bid in the <br />amount of $368,330,00 and reject both Alternates. D.C. Byers Co./Detroit Inc. is a certified <br />responsible bidder. <br />Venues Parks & Arts has appropriated sufficient funds from the Parking Garages (601- <br />0462-645.36-01) $368,330.00. <br />Enclosed: Tabulation <br />