Laserfiche WebLink
REGULAR MEETING JULY 9, 2019 194 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above proposals <br />were referred to the Central Services and Purchasing review team for review and <br />recommendation. <br />AWARD BID AND APPROVE CONTRACT — PULASKI PARK IMPROVEMENTS — <br />PROJECT NO. 118-056 (TIF BOND) <br />Mr. Kyle Silveus, Engineering, advised the Board that on June 25, 2019, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Silveus recommended <br />that the Board award the contract to the lowest responsive and responsible bidder, Larson <br />Danielson Construction Co., Inc., 302 Tyler Street, LaPorte, IN in the amount of $878,686.25 for <br />the base bid plus alternates. Mr. Silveus noted there was a correction to an error in their bid total <br />which showed $878,695.29. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the bid be awarded and the contract approved. Ms. Dorau seconded the motion, <br />which carried. <br />AWARD BID AND APPROVE CONTRACT —GEMINI SITE IMPROVMENTS— PROJECT <br />NO. 119-043 (WWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on June 11, 2019, bids were received and <br />opened for the above referenced equipment. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN in the amount of <br />$614,451.28; Base Bid Only, Contingent of RDC approval. Therefore, Ms. Maradik made a <br />motion that the recommendation be accepted and the bid be awarded and the contract approved, <br />subject to Redevelopment Commission approval of funding. Ms. Dorau seconded the motion, <br />which carried. <br />APPROVAL OF REQUEST TO REJECT BIDS — COMMERCE CENTER ARCHITECTURAL <br />PRECAST CONCRETE PANELS — PROJECT NO. 119-030 (REDA TIF) <br />In a memorandum to the Board, Zach Hurst, Engineering, requested permission to reject all bids <br />for the above referenced project due to missing the project schedule. Therefore, upon a motion <br />made by Ms. Maradik, seconded by Ms. Dorau and carried, the above request was approved. <br />AWARD QUOTATION — ERSKINE CLUBHOUSE BASEMENT FLOORING (VPA <br />FACILITIES & GROUNDS MAINTENANCE) <br />Mr. Patrick Sherman, VPA, advised the Board that on June 25, 2019, quotations were received <br />and opened for the above referenced project. After reviewing those quotations, Mr. Sherman <br />recommended that the Board award the contract to the lowest responsive and responsible quoter, <br />Carpet Service Outlet, Inc., 1514 Mishawaka Ave., South Bend, IN, in the amount of $9,995. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the quotation <br />be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />TABLE AWARD OF QUOTATION — O'BRIEN FITNESS CENTER HVAC (VPA <br />MAINTENANCE) <br />Mr. Patrick Sherman, VPA, advised the Board that on June 25, 2019, quotations were received <br />and opened for the above referenced project. After reviewing those quotations, Mr. Sherman <br />recommended that the Board award the contract to the lowest responsive and responsible quoter, <br />Dynamic Mechanical Services, 1606 Chestnut Street, Mishawaka, Indiana, in the amount of <br />$43,295. The Board discussed their request of Mr. Sherman to provide them with a life -cycle <br />cost of the equipment versus energy efficient equipment. Ms. Martin noted he contacted her to <br />let the Board know he was on vacation last week and hadn't been able to get the information <br />pulled together. Ms. Maradik suggested the Board wait to award until after review of the <br />numbers. Therefore, Ms. Maradik made a motion that the recommendation to award be tabled <br />until later. Ms. Dorau seconded the motion, which carried. <br />AWARD PROPOSAL — TOWING SERVICE FOR CODE ENFORCEMENT DEPARTMENT <br />Ms. Tracy Skibbins, Code Enforcement, advised the Board that on June 25, 2019, proposals were <br />received and opened for the above referenced service. After reviewing and scoring those <br />proposals by the review team from Purchasing and Code Enforcement, Ms. Skibbins <br />recommended that the Board award the contract to the highest scoring proposer, Hamilton <br />Towing, LLC, 4707 W. Western Ave., South Bend, IN. Therefore, Ms. Maradik made a motion <br />that the recommendation be accepted and the proposal be awarded as outlined above. Ms. Dorau <br />seconded the motion, which carried. <br />