My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - VPA Restroom Remodel Project No 118-043R - Michiana Contracting Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - VPA Restroom Remodel Project No 118-043R - Michiana Contracting Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:50:43 PM
Creation date
7/9/2019 2:43:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: Mark Livinahouse <br />To: Gregory M___QGowa_n <br />Subject: Pinhook plumbing <br />Date: Friday, June 7, 2019 3:19:31 PM <br />1. Demolition of the existing cast iron pipe ( lead joints ) and carriers <br />2. Furnish and install new carriers for the water closets in the new locations. <br />3. Furnish excavation as required for the underground connections as required. <br />4. Furnish and install new drain and vent piping in chase (WE intend to reuse existing water <br />piping where possible) <br />5. Cut concrf�dG rre needed in chase and repour. <br />Total cost $18,152.00 <br />IX -A -=44- <br />Thanks <br />Mark Livinghouse <br />Michiana Contracting Inc. <br />PO Box 929 <br />7843 Lilac Rd <br />Plymouth, IN 46563 <br />Work )-9- D <br />Fax .74)j)- 6201, <br />
The URL can be used to link to this page
Your browser does not support the video tag.