My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - VPA Restroom Remodel Project No 118-043R - Michiana Contracting Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - VPA Restroom Remodel Project No 118-043R - Michiana Contracting Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:50:43 PM
Creation date
7/9/2019 2:43:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: Mark Livinahu ouse <br />To: (eirea®ry McGowan <br />Subject: Kennedy Park Plumbing <br />Date: Wednesday, June 19, 2019 9:06:36 AM <br />Re -piping leaking and aged plumbing in chase as needed <br />1 Disconnect existing chase piping and prepare piping for selective demolition. Run a camera down <br />the existing drain pipe and verify the condition prior to connecting new pipe. <br />Should the underground and site piping also be no good then we will address what will be <br />required at that time. <br />2 Furnish and install new sanitary piping (PVC) connect to existing as available. <br />3 Furnish excavation for new underground sanitary piping connection. <br />4 Furnish and install new aboveground sanitary waste and vent piping (PVC) connect to existing <br />venting as available. <br />5 Furnish and install new domestic water piping (copper with mechanical press fitting) connect to <br />existing as available. <br />6 Plumbing fixture modifications to be included in the base pricing with the exception of the <br />replacement of the "urinal" indicated as a "toilet to remain" to become a standard height toilet in <br />the women's restroom. <br />7 Plumbing chase block wall will have to be tore down to make way for plumbing repairs and then <br />rebuilt <br />Additional Plumbing sub cost $9,400.00 <br />Block wall rework cost $2390.00 <br />10% mark up $1,170.00 <br />Total cost $12,960.00 <br />Thanks <br />Mark Livinghouse <br />Michiana Contracting Inc. <br />PO Box 929 <br />7843 Lilac Rd <br />Plymouth, IN 46563 <br />Work (574) 9336-8613 <br />Fax (5_74) 9 ,. Jw. <br />
The URL can be used to link to this page
Your browser does not support the video tag.