My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
QPA Purchase - Network Solutions Incorporated - Howard Park IT Infrastructure
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
QPA Purchase - Network Solutions Incorporated - Howard Park IT Infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:55:45 AM
Creation date
6/25/2019 3:22:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ME 2VF <br />1111017. <br />etwork� �: l utio <br />(electronic preferred). <br />• City of South Bend will provide a list of SSIDs that should be available to users. <br />• City of South Bend will provide an expected window of time that changes can be made to the network <br />including those identified as disruptive. <br />• City of South Bend will provide a list of critical services that must be functional in order for testing to be <br />considered successful. <br />Hardware Installation <br />• City of South Bend will ensure timely access to the equipment installation area. Installation delays caused <br />by access restrictions may be billable on a per occasion instance. <br />• City of South Bend will provide lift access if required for high AP cabling or installation (if applicable). <br />• City of South Bend will provide DHCP services for any new networks that are created. <br />• City of South Bend will install and document the location of each access point by location, name, and AP <br />MAC address. <br />• City of South Bend will have cabling install to the location of each access point. <br />• NSI will configure the switching infrastructure with new VLANs for new wireless SSIDs (up to 4) on the <br />switching infrastructure. <br />Testing <br />• City of South Bend will test access to their critical services identified in the testing plan. <br />Support <br />NSI will provide complete support over any and all included components throughout project implementation.. <br />City of South Bend is eligible for two weeks of NSI helpdesk support following final project sign -off. <br />NSI will provide two hours of dedicated support immediately following the installation. For after-hours work, <br />dedicated support will be provided the day after installation. For example, following configurations changes <br />made in the evening, an NSI engineer would be available from 8 - 10AM the following morning. Any issues <br />suspected by City of South Bend to be related to changes made as part of this project can immediately be <br />directed to the implementation engineer for investigation. <br />Final Deliverables <br />Following the completion of all project work, NSI will provide the following and request project signoff: <br />Documentation: <br />• NSI will provide the final configuration files of the products installed. <br />• Project Completion Signoff Document <br />Appendix A - Specifications <br />Hardware <br />The solution will be built with the following hardware components and specifications„ <br />Catalyst 9300 <br />The Cisco Catalyst 9300 Series Switches are Cisco's lead stackable enterprise switching platform built for security, IoT, mobility, <br />and cloud. As the latest generation of the industry's most widely deployed switching platform, the Catalyst 9300 Series <br />switches form the foundational building block for network services in use today and Cisco's next generation architecture, <br />Software -Defined Access (SD -Access), SD -Access combines wired and wireless topologies, and the Catalyst 9300 Series switches <br />are the first optimized platform ready to handle high -density 802.11ac Wave2 wireless deployments. As wired and wireless <br />traffic converges many network services are being pushed closer and closer to the edge of the infrastructure where Catalyst <br />9300 Series switches are ready with an x86 CPU architecture and more memory, enabling them to host containers and run <br />third -party applications and scripts natively within the switch. The Catalyst 9300 Series offers the features organizations <br />require to operate today and the one's they'll need for the future. <br />CFS%,Ld1It:tC3 <br />www.nsil.com WIIY we do is as important as WIIAII"' we do (574) 271-0900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.