Laserfiche WebLink
10. Northwest corner patch hole in vinyl siding at bottom clapboard adjacent to wall pack lighting for <br />basement entry door. <br />11. Soffit at Pro -shop north elevation to be adjusted. <br />12. Soffit metal and architrave vinyl at west end of porch where joins building north elevation to be repaired <br />— to be repaired by Owner <br />13. Install hand and guard railings on new handicapped ramp and north entry stairs. <br />INTERIOR / GENERAL: <br />1. Remove all construction related debris from interior of building. <br />2. All remaining painting and plaster repair in basement to be completed — by Owner <br />3. Contractor to clean all windows inside and out <br />4. Contractor to clean and remove all construction dust visible and accessible from interior of building. <br />5. Check all track lighting fixtures to ensure all are working correctly and providing the appropriate lighting <br />output. <br />6. Basement exhaust fans need to be hooked up and functioning. <br />7. Mount all wireless access points throughout building. <br />Specific Punch List items - Basement: <br />8. Pro -Shop G01 <br />a. Install concrete or wood fill to north window sill at window. <br />b. Touch up stain on base at pro -shop counter at over reaching mitered joints. <br />c. Metal conduits and junction boxes on ceiling at northeast corner to be painted to match ceiling. <br />9. Snack Bar G02 <br />a. Cut and install service counter. <br />10. Women's Restroom <br />a. Clean rings out of toilets. <br />b. Clean adhesive off mirrors. <br />11. Men's Restroom <br />a. Paint wood column and base to match wood timbers — To be completed by Owner. <br />b. Clean rings out of toilets. <br />12. Corridor G05 <br />a. Clean and paint north stone wall at former electric meter location — To be completed by Owner. <br />b. Clean and paint north concrete wall where wall was removed to east of door 005 —To be <br />completed by Owner. <br />c. Replace missing diffuser in overhead round duct above door 009 to Kitchen. <br />13. Lounge G12 <br />a. North wall under stairs re -install loose hanging light switch with new cover plate to match. <br />b. Remove door pivot pins and mounts in floor between steel pipe column and timber corner pier <br />of room G11. <br />c. Provide and install cover plate for ceiling mounted junction box in north central area of space. <br />14. Open -Gathering Space G14 <br />a. Remove remaining VCT flooring at west end adjacent to outside door closest to room G08. <br />b. Remove or cut back severed conduit and patch hole on south wall approximately 10' east of <br />outside door closest to room G08. <br />Specific List Items — Main Level and Conference Room <br />15. Corridor 103 <br />a. Remove blue tape at flooring transition at both restrooms <br />16. Lounge 104 <br />K I L <br />Page 2 of 3 <br />ARCHITECTURE <br />05/20/2019 <br />PLANNING <br />Erskine <br />fflW, ilarchitecturg,,,,,ggm <br />Kil A/P Proj. # 17043 <br />1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288,2654 VOICE 289, 2420 FAX <br />