My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-29-19 Zoning and Annexation
sbend
>
Public
>
Common Council
>
Minutes
>
Committee Meeting Minutes
>
2019
>
Zoning and Annexation
>
05-29-19 Zoning and Annexation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 5:35:13 PM
Creation date
6/10/2019 5:35:09 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Committee Mtg Minutes
City Counci - Date
5/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND OFFICE OF THE CLERK <br /> Committeemember Voorde asked, What is EIFS? <br /> Mr. Divita replied, That stands for Exterior Insulated Finishing System. <br /> He continued, So between now and when this comes back to Council, we are happy to go into <br /> further detail if you want. I could answer questions now if you would like. <br /> Councilmember Scott asked, So, when are these proposed changes coming to us? <br /> Mr. Divita replied, They are going to the Area Plan Commission for their June meeting, they will <br /> come back to you in your second(2nd) meeting of June. <br /> Mr. Corcoran stated, We would need a sponsoring Council Member for both of these two (2). <br /> Committee Chair Dr. Davis stated, Councilmember Voorde will be one (1) and Councilmember <br /> Broden will be the other. <br /> Larry Magliozzi, Director of the Department of Infrastructure, Planning & Growth with offices <br /> located on the 11th floor of the County-City Building, stated, I would like to remind the Council <br /> that the Area Plan Commission recommends the whole document. If you change something at <br /> Council, it has to go back to the APC. <br /> Councilmember White stated, So,we should give our feedback prior to the Area Plan Commission <br /> meeting. <br /> Ms. Smith stated, In case you missed the introduction yesterday, I have joined the Department of <br /> Community Investment. My task, for the rest of the year, is to help with the transition for the <br /> adoption of the new Zoning Ordinance, as well as the formation of the South Bend Plan <br /> Commission Board of Zoning Appeals. So, what I want to touch on tonight is the timeline of what <br /> this will look like (referencing a slide in the presentation). The reformatting of the Zoning <br /> Ordinance, we are well underway. We've been working with a consultant and we hope to have a <br /> final working draft by early to mid-June. That will allow us to start reaching out to developers, <br /> getting interdepartmental reviews from Fire and Engineering, and start getting public engagement <br /> where we can take a document out to the public. From what I've heard, the 2005 adoption was a <br /> much larger overhaul of the Zoning Ordinance,there were a lot of Committee meetings,but I don't <br /> know how much outreach there was to take this out to the public. We want to make sure this isn't <br /> a surprise to anybody. We're not making major changes, but we are updating things and we want <br /> people to feel they have the opportunity to comment and be included. We have an engagement <br /> strategy I will talk a little bit about. That would allow us to get all the comments back to the <br /> consultant by the end of July to make any tweaks to the draft that we need to do so we can introduce <br /> it for the September Plan Commission meeting, hopefully, and get it in front of the Council in <br /> October. Part of why we are going on that timeframe is even though we anticipate it not going into <br /> effect until January Pt is we want to allow time for us to formulate the Plan Commission and do <br /> training.We want to train the Building Department on what the new standards are so,come January <br /> 1St, we are ready to go, and we don't have a whole lot of problems with that transition. So, we are <br /> trying to make sure we do everything we can to make sure the transition is as smooth as possible <br /> with all the departmental agencies. <br /> EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION EMPOWERMENT <br /> 455 County-City Building 227W.Jefferson Bvld South Bend,Indiana 46601 p 574.235.9221 f574.235.9173 TTD 574.235.5567 twwv.southbendin.gov <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.