My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - American Structurepoint Inc - Wellhead Protection Plan
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - American Structurepoint Inc - Wellhead Protection Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:00:02 PM
Creation date
5/29/2019 11:24:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMFRICAN <br />I�w STRUCTUREPOI'NT <br />R i/ INC <br />May 9, 2019 <br />Michelle Smith <br />Director of Water Quality and Laboratory <br />City of South Bend <br />830 N. Michigan St. <br />South Bend, Indiana 46601 <br />Re: Wellhead Protection Plan 5-Year Update <br />South Bend, St. Joseph County, Indiana <br />Proposal No. 201900828 <br />Dear Michelle, <br />7260 SHADELAND STATION <br />INDIANAPOLIS, INDIANA 46256 <br />TEL 317,547.5580 <br />FAX 317.543.0270 <br />American Structurepoint, Inc., is pleased to provide the following proposal for preparation of the <br />South Bend Wellhead Protection Plan 5-year update. The American Structurepoint team is <br />uniquely qualified to prepare the 5-Year Update based on our experience developing wellhead <br />protection plans for several utilities, our thorough understanding of the Indiana wellhead <br />protection regulations and procedures and our excellent working relationship with the current <br />IDEM review staff. <br />In developing this proposal, we understand the following: <br />• The South Bend Water Works is required to submit your 5-year update on or before <br />January 1, 2020. <br />• New wells at Memorial Hospital and new well 1B at North station will require a re - <br />delineation of at least the North Wellfield wellhead protection area. <br />• The IDNR water use registration records indicate the South Bend Water Works operates <br />30 high capacity production wells. Total average daily withdrawal, according to the IDNR <br />data, is approximately 15 million gallons per day in 2017. <br />• The local planning team (LPT) met in 2016 and 2017. <br />• The St. Joseph County Health Department (SJCHD) manages a wellhead protection permit <br />area site development application and inspection process. <br />• Outreach includes: SJCHD wellhead permits, and CCR <br />• A hazardous materials transport plan of the main thoroughfares has been established and <br />is to be included in the 5-year update. <br />2019.00828 <br />
The URL can be used to link to this page
Your browser does not support the video tag.