Laserfiche WebLink
IHOWAIRID IPAIRK REDEVELOPMENT <br />t CITY OFSOUTH BEND <br />Lochmueller is currently providing construction inspection services <br />tr for 12 acres in Howard Park. <br />IMPROVEMENTS INCLUDE <br />» 14,300 SF, 1-story community center <br />» 4,300 SF, 1-story support facility <br />If » Outdoor ice skating pond/trail <br />» Outdoor playground <br />» Interactive water fountain <br />Ir » Riverfront trail improvements including event lawn with trail - <br />lighted connections to St. Louis Boulevard <br />» New curb, sidewalk, HMA pavement, watermain, storm sewer, <br />& lighting on St. Louis Boulevard <br />Phase 1 <br />» Coordination with NS & <br />Winamac Southern Railroads <br />» Partial ROW from 20 parcels <br />» Construction Cost: <br />$1,758,000 (2017) <br />(Phase 2 <br />» Partial ROW from 11 parcels <br />Construction Cost: <br />$2,750,500 (2018) <br />CASS COUNT' <br />Members of our team secured funding, worked on the design and <br />ROW acquisition, and are providing inspection services for CR 400S. <br />Together, all phases consist of 19,000 feet of roadway <br />reconstruction from an existing 2-lane section with shoulders to an <br />improved 2-lane section with curb -and -gutter (Phase 1) and 2-lane <br />section with improved shoulders, ditches, and updated clear zone <br />(Phases 2 - 4). <br />Throughout the project, we ensured Cass County was well informed <br />of the project status. Our team worked with adjacent property <br />owners, adding pipes and structures to reduce impacts on <br />neighboring farms. When changes occurred, we worked with the <br />County and INDOT to minimize the overall impact to the schedule, <br />budget, and funding. <br />Susan and her team successfully partnered with Cass County to; <br />» Scope, design, & inspect the corridor project <br />» Provide extensive funding support <br />Phase 3 <br />» Partial ROW from 6 parcels <br />» Estimated Construction Cost <br />$3,300,000 (2019) <br />y. <br />��, aawummm �imm��w�imm�u���mididu� �uum000000mou�oww��wNmimm���unu�i�i�ce�w�o�mmm�u��m�mr <br />Phase 4 <br />» Partial ROW from 15 parcels <br />» Estimated Construction Cost: <br />$2,700,000 (2020) <br />