My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Corby Ironwood Rockne Drive Project No 116-034 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - Corby Ironwood Rockne Drive Project No 116-034 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:55:31 PM
Creation date
5/29/2019 11:13:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IHOWAIRID IPAIRK REDEVELOPMENT <br />t CITY OFSOUTH BEND <br />Lochmueller is currently providing construction inspection services <br />tr for 12 acres in Howard Park. <br />IMPROVEMENTS INCLUDE <br />» 14,300 SF, 1-story community center <br />» 4,300 SF, 1-story support facility <br />If » Outdoor ice skating pond/trail <br />» Outdoor playground <br />» Interactive water fountain <br />Ir » Riverfront trail improvements including event lawn with trail - <br />lighted connections to St. Louis Boulevard <br />» New curb, sidewalk, HMA pavement, watermain, storm sewer, <br />& lighting on St. Louis Boulevard <br />Phase 1 <br />» Coordination with NS & <br />Winamac Southern Railroads <br />» Partial ROW from 20 parcels <br />» Construction Cost: <br />$1,758,000 (2017) <br />(Phase 2 <br />» Partial ROW from 11 parcels <br />Construction Cost: <br />$2,750,500 (2018) <br />CASS COUNT' <br />Members of our team secured funding, worked on the design and <br />ROW acquisition, and are providing inspection services for CR 400S. <br />Together, all phases consist of 19,000 feet of roadway <br />reconstruction from an existing 2-lane section with shoulders to an <br />improved 2-lane section with curb -and -gutter (Phase 1) and 2-lane <br />section with improved shoulders, ditches, and updated clear zone <br />(Phases 2 - 4). <br />Throughout the project, we ensured Cass County was well informed <br />of the project status. Our team worked with adjacent property <br />owners, adding pipes and structures to reduce impacts on <br />neighboring farms. When changes occurred, we worked with the <br />County and INDOT to minimize the overall impact to the schedule, <br />budget, and funding. <br />Susan and her team successfully partnered with Cass County to; <br />» Scope, design, & inspect the corridor project <br />» Provide extensive funding support <br />Phase 3 <br />» Partial ROW from 6 parcels <br />» Estimated Construction Cost <br />$3,300,000 (2019) <br />y. <br />��, aawummm �imm��w�imm�u���mididu� �uum000000mou�oww��wNmimm���unu�i�i�ce�w�o�mmm�u��m�mr <br />Phase 4 <br />» Partial ROW from 15 parcels <br />» Estimated Construction Cost: <br />$2,700,000 (2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.