Laserfiche WebLink
B. INCLUSIONS <br />This proposal includes: <br />-- Insulated and solid arch. precast panels, in sizes and thickness as per Coreslab's take -off and panelizations. <br />-- SCHEDULE: See Coreslab schedule attached. Precast erection starts 12/9/19 as noted in contract schedule, but <br />precast erection duration is longer (approx. (110) working days required). Straight time only, see Section II Plan & <br />Equipment Questionnaire for more information concerning schedule and erection assumptions included in price. <br />-- All arch. precast pieces to have one face mix, factory buff with back mix to be buff or gray. <br />-- Arch. precast face mix to match as closely as possible to PCI Plate # 119, with a light acid etch or sandblast finish. <br />-- Precast back mix to be structural gray concrete, where exposed having a two (2) pass hard steel trowel finish. The back <br />finish in non -exposed areas is to have a one (1) pass steel trowel finish. <br />-- 12" x 12" samples will be submitted for mix color and finish approval. <br />-- (2) sample panels approx. 16 SF in area to be viewed and approved at the precast plant. No site mock-up. <br />-- Precast insulation board to be 3" thick extruded polystyrene, Type IV, with square edges. <br />-- Insulated precast panels to have non-metallic wythe connectors. <br />- Thin brick cast into precast where shown to be Utility size, Metrobrick 350 Main street flashed and 101 Commons. <br />-- Limestone pattern form liner provided where shown as 8" x 16" with 3/8" wide reveals and 1/4" reveal depth. <br />-- Erection of precast, in (1) mobilization for crane and crew. Access to be by Others to be within 20' of the exterior, <br />except where not possible due to existing structures (South elevation from Lines 1 to 7). South elevation precast from <br />Lines 4 to 7 and D to H may be set using the tower crane on site, per the requirements noted in Add. # 3. Schedule shall <br />be during normal work hours and be continuous for the erection crew. Tower crane pieces shall be picked off E. Lasalle Ave. <br />-- Tower crane cannot be used during precast erection with the ground crane if they interfere with each other. <br />- Ground crane access will be required on all (4) sides of the structure, to within 20' of it if possible. <br />-- If a street closure/blockage is required during assembly or disassembly of the crane it shall be provided by Others <br />at no cost to Coreslab and to be during normal working hours. <br />-- An operated and maintained Buckhoist is to be provided by Others, at no cost to Coreslab or our erector, for transportation of <br />personnel, equipment, and materials throughout the entire scope of work and shall be a minimum of 12'-0" deep. <br />-- Panels to bear on slab edge, typically. Assume approx. (200) locations where pre -welds will be attached to columns for bearing. <br />-- The Weld Inspector is to be available at all times during prewelds and erection. If he is not available, pictures will be taken <br />of the welds and will be treated as acceptable if no response by 24 hours. <br />-- Embeds for any cast -in -place concrete work necessary for precast connx. will be furnished by Coreslab, installed by Others. <br />-- Shims and bearing pads are provided as required. Shimming and grouting as required. <br />-- Uncoated reinforcement. <br />-- All exposed to final exterior embedded plates, anchorage devices, and loose connection devices shall be galvanized. <br />-- All remaining embedded plates, anchorage devices, and loose connection devices shall be prime painted. <br />-- It is assumed that first level precast connections to the CIP structure will be post -installed by Coreslab. <br />-- All other embeds required in foundation or CIP structure shall be designed & provided by Coreslab, installed by Others. <br />-- Caulking of the precast to precast joints only. <br />-- Indiana licensed engineering for precast product and connection design, and framing layout. <br />-- Payment & Performance Bond. <br />C. EXCLUSIONS <br />This proposal does not include any other items and specifically the following: <br />- Any field laid limestone, material and connections (designed & provided by Others in Alt. #1). <br />-- Any cast -in -place concrete work. Any installation of precast embeds in foundation or structure. <br />-- Any full size mock-ups. Any mock-ups erected at the jobsite, reduced size mock-up only, delivered with off-loading by Others. <br />-- ACCESS for crane & trucks to move under their own power, per the requirements noted above. <br />- Any crane mats (assume exterior crane road paths will be provided by Others to within 20' of the structure). <br />-- Any precast panel erection work underneath existing poured -in -place formwork. <br />-- Buckhoist (to be provided by Others, as described above). <br />-- Utility location or protection. Any dewatering of footings. <br />- Sealer, painting, staining, water proofing, expansion joints. Caulking of precast to dissimilar materials (limestone, metal, etc.). <br />-- Any field cuts in precast products which may be required by other trades. Patching of chips caused by other trades. <br />- Structural steel or continuous steel members. <br />- Any jobsite firesafing. <br />- TAXES OF ANY TYPE (tax exempt cert. must be provided to us for our records). <br />III. PROVISIONS <br />WIWI <br />M - �y • .» e <br />1. Coreslab Structures (Indianapolis) Inc.is a Certified Plant under the Prestressed Concrete Institute's Plant Certification program. <br />