My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:06:55 PM
Creation date
5/29/2019 11:00:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND` <br />Project Name: 2019 Community Crossings <br />��..��.. �. ............. <br />Project Number: 119-015 <br />For Bids Due: May 28, 2019, 9:30 a.m., Local Time <br />Contractor <br />Name: Rieth Riley Construction Co. Inc. <br />...... <br />Item....__�__��_�..... <br />...�................ <br />No. <br />Line Item Quantity Unit <br />Unit Price <br />Cost <br />$58.17 <br />,7 $40_.. <br />1.90 <br />19 <br />Concrete Sidewalk, 4" 70 SY <br />_......... .........._ <br />_ <br />... .._. <br />4.63 <br />._.__ ............� <br />$6,716.70 <br />20 <br />Concrete Curb Ramp, Remove 90 SY <br />$177.11 <br />$12,397.70 <br />21 <br />Concrete Curb Ramp 70 SY <br />22 <br />Detectable Warning Surface 35 SY <br />DIVISION 1 TOTAL <br />$280,910.38 <br />D I VISION <br />mm <br />2: JEFFERSON BLVD TO LOGA IRONWOOD N <br />....................... <br />j_. ..__....... <br />Item <br />No. <br />......._..........____....... <br />Line Item <br />.................�.......w__w <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />m$m15,099.15 <br />$15,099.15mm <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />$33,000.00 <br />$33,000.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />.._� . <br />$546.55..._ ....a.... <br />$3,279.30..��..��..�m <br />3 <br />Coring <br />6 <br />EA <br />4 <br />Milling, Up to 1.5" <br />..�._._......�....w � ._........._ � w <br />28,055 <br />SY <br />$3.68 <br />$12,990.40 <br />5 <br />Milling, Additional 2" <br />3,530 <br />SY <br />$88.70 <br />$230,620.00 <br />6 <br />HMA Surface, 9.5 mm — Type B <br />_.............................. <br />2,600 <br />TONS <br />$94.45 <br />$28,335.00ITmmmmm <br />7 <br />HMA Wedge and Leveling — Type B <br />... ................_ ...........a.a. <br />300 <br />TONS <br />$142.32 <br />$10,958.64 <br />8 <br />HMA for Patching <br />77 <br />TONS <br />$0.05 <br />$0.60 <br />9 <br />Tack Coat <br />12 <br />TONS <br />$0.05 <br />$958.70 <br />10 <br />Joint Adhesive, Surface <br />19,174 <br />LF <br />_.. <br />I $250.00 <br />$1,000.00 ....... <br />11 <br />Adjust Manhole to Grade <br />4 <br />EA <br />Addendum No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.