My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:06:55 PM
Creation date
5/29/2019 11:00:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL�, <br />CITY OF SOUTH BEND <br />Project Name: 2019 Community Crossings <br />Project Number: 119-015 <br />For Bids Due: May 28, 2019, 9:30 a.m., Local Time <br />Contractor <br />Name: Rieth Riley Construction Co. Inc. <br />DIVISION <br />1: CORBY BLVD. (IRONWOOD TO MANCHESTER) <br />. .......... ........ ..... <br />Item <br />No. <br />Line Item <br />........ .................wwww <br />Quantity <br />y <br />unit <br />Unit Price <br />Cost <br />.... <br />$10,366.45 <br />$10,366.45�...m <br />1 <br />........... ,— <br />Maintenance of Traffic �__w <br />........... ............ <br />1 <br />LS <br />_....�_ <br />$26,000.00 <br />........ _ ..... _......_.. <br />$26,000.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$546.55 <br />$1,639.65 <br />3 <br />Coring ............................ _......__... <br />3 <br />EA <br />$1.72 <br />$24,768.00 <br />4 <br />Milling, Up to 1.5" <br />�....................w_w...ww <br />14,400 <br />SY <br />................. <br />$3.30 <br />$14,520.00 <br />5 <br />Milling,Additional 2" <br />4 400 <br />SY <br />�._...... ..�. <br />$89.24 <br />2 ,32 �m�....... <br />$138.00 <br />6 . <br />HMA Surface, 9.5 mm —Type B <br />............. ..__ <br />1,'!�1'!1511 1� <br />TONS <br />$101.93 <br />$5,096.50 <br />7 <br />HMA Wedge and Leveling — Type B <br />50 <br />TONS <br />$126.36 <br />$12,383,28 <br />8 <br />HMA for Patching <br />98 <br />TONS <br />$0.05 <br />$0.35 <br />9 <br />Tack Coat <br />..._ w . ....... __............ <br />TONS <br />$0.05 <br />$455.00 <br />10 <br />.� ....................w_ <br />Joint Adhesive, Surface <br />.......�...................... <br />9,100 <br />LF <br />�._..... ..... <br />._....... <br />$250.00 <br />........ <br />$4,000.00 <br />11 <br />Adjust Manhole to Grade <br />16 <br />EA <br />$250.00 <br />0.00 <br />$1,75 <br />12 <br />Adjust Inlet to Grade <br />7 <br />EA <br />$2.50 <br />$425.00 <br />13 <br />Line, Thermoplastic, Solid, White, 6" <br />170 <br />LF <br />$0.45 <br />$2,362.50 <br />14 <br />Line, Thermoplastic, Solid, Yellow, 4 .. <br />5,250 <br />LF <br />$0.45 <br />$288.00 <br />15 <br />Line, Thermoplastic, Broken, Yellow, 4 <br />640 <br />LF <br />$0.35 <br />$2,061.50 <br />16 <br />Grooving for Pavement Markings, 4" <br />�...... ....................... ............. <br />5,890 <br />LF <br />_.._ <br />.... <br />.. <br />$2.00 <br />_..... <br />$340.00 <br />17 <br />Grooving for Pavement Markings, More than 4" <br />170 <br />LF <br />$114.01 <br />$9,690.85 <br />18 <br />Concrete Sidewalk, Remove <br />85 <br />Sy <br />Addendum No. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.