Laserfiche WebLink
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2019 Curb and Sidewalk Construction <br />119-004 <br />May 14, 2019 at 9:30am Local Time <br />Rieth-Rilev Construction Co., Inc. <br />rye <br />)IVISION <br />C2 <br />Item <br />Description <br />Quantity <br />Unit Unit Price Total Amount <br />No. <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />190 J <br />SYS $40,00 $7.600.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />190 <br />SYS <br />65.50 <br />1.2 445.0 <br />3 <br />CONCRETE CURB, REMOVE <br />357 <br />LFT <br />20.00 <br />7 140 0 <br />4 <br />CONCRETE CURB, MODIFIED <br />357 <br />LFT <br />5.00 <br />$12m495.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />40 <br />SYS <br />$30.00 <br />$1,200,00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />40 <br />SYS <br />514,QQQ <br />$5,fimoo <br />7 <br />TOPSOIL AND SEEDING <br />357 <br />SYS <br />$15.58 <br />$5,562.06 <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />S1,300.00 <br />$2,600,00 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, <br />$700.00 <br />$1,400.00 <br />14 <br />2-IN TO 2.5 IN <br />2 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />24 <br />SYS <br />$90-00.1 <br />52.160.00 <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />8 <br />SYS <br />5230.00 <br />1 40,00 <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />17 <br />2 2 p <br />DIVISION C2 TOTAL $62,762.06 <br />)IVISION <br />D1 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />391 <br />SYS <br />_27.00 <br />$10,557.99 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />391 <br />SYS <br />S66.0Q <br />525,806.00 <br />3 <br />CONCRETE CURB, REMOVE <br />370 <br />LFT <br />$17.QO <br />6 29 .00 <br />4 <br />CONCRETE CURB, MODIFIED <br />370 <br />LFT <br />37.00 <br />13 690.00 <br />7 <br />TOPSOIL AND SEEDING <br />370 <br />SYS <br />$15.39. <br />$5,694.30 <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />51.300,00 <br />$2,60,00 <br />PLANT, DECIDUOUS TREE, SINGLE <br />$700.00 <br />$1,400.00 <br />14 <br />STEM 2-IN TO 2.5 IN <br />2 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />56 <br />SYS <br />$85.0 ____ <br />760,00 <br />ONE-WAY PERPENDICULAR CURB <br />$247.00 <br />$5,928.00 <br />16 <br />RAMP <br />24 <br />SYS <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />32 <br />SYS <br />211.0 <br />6 752..00 <br />DIVISION D1 TOTAL $83,477.30 <br />)IVISION <br />D2 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price Total Amount <br />No. <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />188 <br />SYS <br />$40,QQ7 20.00 <br />2 <br />CONCRETE SIDEWALK, 4-1N <br />188 <br />SYS <br />70.00 13 160.00 <br />3 <br />CONCRETE CURB, REMOVE <br />168 <br />LFT <br />23,00 <br />3 864 00 <br />4 <br />CONCRETE CURB, MODIFIED <br />168 <br />LFT <br />$35.00 <br />55.880.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />20 <br />SYS <br />5100.00 <br />2.00 0 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />20 <br />SYS <br />$250.010 <br />$5,000.00 <br />7 <br />TOPSOIL AND SEEDING <br />130 <br />SYS <br />927.37 <br />S3.558,10. <br />15 <br />CURB RAMP, REMOVE <br />16 <br />SYS <br />$7_Q..QQ <br />$1,12Q,O <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />1$2.0_0 <br />$2,912,QF1 <br />DIVISION D2 TOTAL $45,014.10 <br />Version 10/17/2017 Contractor's Bid for Public Works - 2 <br />