Laserfiche WebLink
Project Name: <br />Project Number: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2019 Curb and Sidewalk Construction <br />119-004 <br />For Bids Due: May 14, 2019 at 9:30am Local Time <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />44 <br />HVISION <br />Al <br />Item <br />No. <br />Description <br />Quantity Unit Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />364 SYS $3Q.00 <br />10 920.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />364 <br />SYS <br />558,00 <br />S21.112.00 <br />3 <br />CONCRETE CURB, REMOVE <br />603 <br />LIFT <br />$14.00 <br />$8,442.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />603 <br />LIFT <br />935.00 <br />$21,105,00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />50 <br />SYS <br />S24.Q0 <br />1 2 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />50 <br />SYS <br />$107,000 <br />7 <br />TOPSOIL AND SEEDING <br />454 <br />SYS <br />$14,32 <br />6 501.28 <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />51.300.00 <br />92.600.00 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />5 ,0 <br />55 .0 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />$650.00 <br />$1,950.00 <br />STEM, 2-IN TO 2.5 IN <br />3 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />40 <br />SYS <br />S61,00 <br />52.440.00 <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />8 <br />SYS <br />S220.0Q <br />$1,760.QQ <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16.0 <br />SYS <br />$165.00 <br />$2,640.00 <br />18 <br />DEPRESSED CORNER CURB RAMP <br />16.0 <br />SYS <br />$137.00 <br />$2,192.00 <br />DIVISION Al TOTAL $88,762.28 <br />MVISION <br />B1 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />179 <br />SY <br />$32,QQ <br />$5,72&00 <br />2 <br />CONCRETE SIDEWALK„ 4-IN <br />179 <br />SY <br />3 <br />CONCRETE CURB, REMOVE <br />242 <br />LF <br />916.00 <br />S3,872M <br />4 <br />CONCRETE CURB MODIFIED <br />242 <br />LF <br />00 <br />228.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />20 <br />SY <br />$60,00 <br />1200.00 <br />6 <br />PCCP FOR APPROACHES 6-IN <br />20 <br />SY <br />$69.00 <br />$1,380.00 <br />7 <br />TOPSOIL AND SEEDING <br />242 <br />SY <br />$19.24 <br />4 65 .08 <br />DIVISION 131 TOTAL 135,983.08 <br />HVISION <br />C1 <br />Item <br />Description <br />Quantity Unit <br />Unit Price Total Amount <br />No. <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />320 SYS <br />$3j,90 ®S11200.00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />320 <br />SYS <br />56, 0__$17.920.00 <br />3 <br />CONCRETE CURB, REMOVE <br />631 <br />S14.50 $9,149.50 <br />4 <br />CONCRETE CURB, MODIFIED <br />631 <br />LFT <br />830.00 $1-8493am <br />5 <br />CONCRETE APPROACH, REMOVE <br />162 <br />SYS <br />22 64,,00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />162 <br />SYS <br />12 2 8 8,00 <br />7 <br />TOPSOIL AND SEEDING <br />631 <br />SYS <br />12,78 8 064.18 <br />11 <br />TREE REMOVE 30IN <br />1 <br />EA <br />S1.300,00 $1,300.00 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />$550,00 50.00 <br />PLANT, DECIDUOUS TREE, SINGLE <br />$700.00 $1,400.00 <br />14 <br />STEM, 2-IN TO 2.5 IN <br />2 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />32 <br />SYS <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />32 <br />SYSEE16 <br />0 5 12 0 <br />DIVISION C1 TOTAL S.99 375.68 <br />Version 10/17/2017 Contractor's Bid for Public Works -1 <br />