Laserfiche WebLink
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />DIVISION C2 <br />BID/PROPOSAL <br />CITY OF SOUTH <br />BEND <br />20.1..9....Curb and Sidewalk Construction <br />9-004 <br />May, <br />y 14, 2019 at 9:30am Local Time <br />M <br />Item <br />No. <br />.. ............... ........ ...... _ .._ <br />Description <br />.. _w___ ..._ <br />Quantity <br />....... <br />Unit <br />. w....... m <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />190 <br />SYS <br />®,00 <br />?,o, oo <br />2 <br />'CONCRETE SIDEWALK, 4-IN <br />190 <br />SYS <br />("00/,2 <br />S D,00 <br />3 <br />CONCRET_E CURB, REMOVE <br />357 <br />LFT <br />,00 <br />6 o® <br />4......._mmmCONCRETE <br />CURB, MODIFIED <br />357 <br />LFT <br />ao <br />/ 26 , <br />5 <br />CONCRETE APPROACH, REMOVE <br />40 <br />SYS <br />ao <br />a3 20- o <br />6 <br />PCCP FOR APPROACHES 6-IN _...... <br />40 <br />... mm_ ..................._._.__ <br />SYS <br />l.�_.�o.... _ <br />...__.-.?.... <br />7 <br />TOPSOIL AND SEEDING <br />357 <br />SYS <br />, o® <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />p pp <br />�100 0 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, <br />14 <br />2-IN TO 2.5 IN <br />2 <br />EA <br />756•Do <br />1.S-oo . o0 <br />15 <br />CURB RAMP, REMOVE <br />24 <br />SYS <br />6,5,co <br />&0100 <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />8 <br />SYS <br />A to -00 <br />16S0,00 <br />17 ® <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />.oa <br />®,oe <br />DIVISION C2 TOTAL * 7 f i y'� . 0o <br />DIVISION D1 <br />No. <br />Description <br />.............. _._.........................._ <br />Quantity <br />Unit <br />........................ .W <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />391 <br />SYS <br />b <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />391 <br />SYS <br />.00 <br />1Oc> <br />3 <br />CONCRETE CURB, REMOVE <br />370 <br />LFT <br />,od <br />7Y60,00 <br />4 <br />CONCRETE CURB, MODIFIED <br />370 <br />LFT <br />7 <br />TOPSOIL AND SEEDING <br />370 <br />SYS, <br />11 <br />TREE, REMOVE, 30 IN _._._._._._._._._..._._._._._..._._____ <br />PLANT, DECIDUOUS TREE, SINGLE <br />14 <br />STEM, 2-IN TO 2.5 IN <br />2 <br />EA <br />725.E <br />1 `LSD• d0 <br />15 <br />CURB RAMP, REMOVE <br />56 <br />SYS <br />j;?.00 <br />0 3.2 , oD <br />ONE-WAY PERPENDICULAR CURB <br />�(GS®• 00 <br />16 <br />RAMP_ <br />24 <br />SYS <br />, oD <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />32� <br />SYS <br />DIVISION D1 TOTAL 7 ,?.f <br />DIVISION D2 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />1 <br />........................................_-- <br />CONCRETE SIDEWALK, REMOVE <br />188 <br />SYS.oa <br />700, GYM <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />188 <br />SYS <br />3 <br />CONC...._...._...RETE CURB, REMOVE <br />168 <br />LFT <br />, 00 <br />6 ,o® <br />4 <br />................................._. <br />CONCRETE CURB, MODIFIED _ <br />168 <br />LFT <br />.00 <br />b, 00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />20 <br />SYS <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />20 <br />SYS <br />(y� .00 <br />D. o,p <br />7 <br />TOPSOIL AND SEEDING <br />130 <br />SYS <br />p,oD <br />OD.00 <br />1 <br />21 <br />CURB RAMP, REMOVE �IT m . <br />16 <br />SYS <br />/5 , ao <br />_ ,00 <br />7 <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />o .ors <br />p, 00 <br />DIVISION D2 TOTAL* _ 1.2y.00 <br />Version 10/17/2017 Contractor's Bid for Public Works - 2 <br />