Laserfiche WebLink
BID/PROPOSAL <br />Y OF SOUTH BEND <br />Project Name: <br />1 <br />2019 Curb and Sidewalk Construction" <br />Project Number. <br />1 <br />119 004 <br />For Bids Due: <br />May 14, 2019 at 9 30am Local Time <br />Contractor Name: <br />G/ vice 2nc. <br />_r"urnw <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />364 <br />SYS <br />_ <br />_ o� •Oc7 <br />too, 00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />364 <br />SYS <br />��'Co <br />3 .®O <br />3 <br />CONCRETE CURB, REMOVE _ <br />603 <br />LFT <br />5 ,00 <br />4 <br />CONCRETE CURB, MODIFIED <br />603 <br />LFT <br />5 <br />CONCRETE APPROACH, REMOVE <br />50 <br />!SYS <br />oo <br />IT6ITITITITmI_PCCP <br />FOR APPROACHES, 6-IN <br />50 <br />SYSmm <br />/m�m,00,op <br />7 <br />TOPSOIL AND SEEDING <br />454 .._ <br />L.-SYS <br />/00O <br />,od <br />11 <br />TREE, REMOVE, 30 IN <br />IT 2 <br />EA <br />z , co <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />600.06 <br />, <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />700Xa0 <br />l00 00 <br />STEM, 2-IN TO 2.5 IN <br />3 <br />EA <br />a . <br />15 _' <br />CURB RAMP, REMOVE <br />40 <br />SYS <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />8 <br />j SYS <br />a -oo <br />O ( , 00 <br />17 <br />_ PAIRED PERPENDICULAR CURB RAMP <br />16.0 _ <br />SYS <br />a1(pwwwwoe <br />18 <br />DEPRESSED CORNER CURB RAMP <br />16.0 <br />SYS <br />.2;tD,0D <br />DIVISION <br />Al TOTAL <br />�% %, 897 •44 <br />DIVISION B1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />w 1 _ <br />CONCRETE SIDEWALK, REMOVE <br />179 <br />SY <br />S•o® <br />Cps ,00 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />179 <br />1 SY <br />-2 .00 <br />13 y2 ,o® <br />3 <br />CONCRETE CURB, REMOVE <br />00 <br />4 <br />CONCRETE CURB, MODIFIED <br />5 <br />.............................. <br />CONCRETE APPROACH, REMOVE <br />20 <br />SY <br />p, 00 <br />,00 <br />6 <br />PCCP FOR APPROACHES 6-IN <br />20 <br />SY <br />��_O <br />_ <br />.2 00 00 <br />7 <br />TOPSOIL AND SEEDING <br />242 <br />SY <br />a,Op <br />DIVISION <br />131 TOTAL $ ! 0,2440 <br />DIVISION <br />C1 <br />Item <br />No. <br />Description <br />Quantity Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />320 <br />SYS <br />.)"Fe®b <br />b®Oo <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />320 <br />SYS <br />o, op <br />3 <br />CONCRETE CURB, REMOVE <br />631 .... <br />LFT <br />4 <br />CONCRETE CURB, MODIFIED <br />631 <br />[FT <br />oD <br />p ,op <br />5 <br />CONCRETE APPROACH REMOVE <br />162 <br />SYS <br />��. oD <br />, l , oQ <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />162 <br />SYS <br />pS. 00 <br />. ry �pT ao <br />.......7 <br />.. .....__.�._.._........_..... <br />TOPSOIL AND SEEDING <br />631 <br />SYS <br />m m,o w <br />w A 3, op <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />7 0•0o <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />7$;00 <br />32�o_O <br />PLANT, DECIDUOUS TREE, SINGLE <br />14 <br />STEM, 2-IN TO 2.5 IN <br />2 <br />EA <br />15 _ <br />CURB RAMP, REMOVE <br />32 <br />----- .. <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />32 <br />SYS <br />a <br />&0 - .. <br />DIVISION C1 TOTAL <br />i 1$ y 30. OD <br />Version 10/17/2017 <br />Contractor's Bid for <br />Public Works <br />- 1 <br />