My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05142019 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2019
>
05142019 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:21:10 PM
Creation date
5/28/2019 11:23:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MAY 14, 2019 124 <br />1 <br />RIETH-RILEY CONSTRUCTION CO.. INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />Bid was signed by: Joshua A. McCormick <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />Subtotal for Base Bid <br />$1,941,000.00 <br />Alternate A <br />$19,775.00 <br />Subtotal of A and <br />Alternate A2 <br />$3,640.00 <br />Subtotal of Alternate B <br />$7,000.00 <br />Subtotal of Alternate C <br />$122,400.00 <br />Subtotal of Alternate D <br />$12,640.00 <br />Subtotal of Alternate E <br />$15,800.00 <br />Base Bid Total with <br />Alternates A Thru E <br />$2,122,255.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. O'Sullivan and carried, the above bids <br />were referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF BIDS — 2019 CURB AND SIDEWALK CONSTRUCTION — PROJECT NO <br />119-004 (MVH) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />WALSH & KELLY, INC. <br />24358 SR 23 <br />South Bend, IN. 46614 <br />Bid was signed by: Dustin Hilary <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />LI-IR611 <br />Division Al Total <br />$138,426.00 <br />Division B1 Total <br />$54,220.00 <br />Division C1 Total <br />$160,900.00 <br />Division C2 Total <br />$83,410.00 <br />Division D1 Total <br />$112,582.47 <br />Division D2 Total <br />$53,220.00 <br />Alternate 1 Total <br />$39,905.00 <br />Alternate 2 Total <br />$29,350.00 <br />Base Bid plus <br />Alternates <br />$672,013.47 <br />PREMIUM CONCRETE SERVICES. INC. <br />712 Richmond Street <br />Elkhart, IN 46516 <br />Bid was signed by: Max Yeakey <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Division Al Total $111,894.00 <br />Division B1 Total $49,026.00 <br />Division Cl Total $118,430.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.